Rajya Krishi Utpadan Mandi Parishad Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date27 Nov 2024
Closing Date11 Dec 2024
Tender Amount₹ 12,69,576
Costs
EMD
₹ 1,30,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RKUMP_977453_1Bid Award Id
ViewTender No
U.N.(N.)AYO/(NIVIDA)/2024-597 Dated 26.11.2024Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per MORD Technical Specification Clause 510 and direction of Engineer-in-charge .
2050.2
66
137158.38
... More
Providing & fixing of M.S. Sign Board as per approved Drawing of Mandi Parishad at road site including Painting with enamel paint and letter writing with road sign as per direction of E/I.
1
8000
8000
... More
Earth in cutting or in embankment in ordinary soil , excavation to be done in form of regular pits not exceeding 1/2 M. in depth and work in embankment to be in 20 cm layers including ramming and dressing the surface to required level and slopes and also including 1.5 M. lift and 30 m lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 m distance as directed by the Engineer in charge
804
110
88440
... More
Supply and laying and fixing of 350 mm dia NP-3 R.C.C. Hume pipe with required collors including loading, unloading, cartage upto site. Supply of all materials all labour. T&P etc. and also including all other taxes/charges for proper completion of work as per direction of the Engineer in charge. Jointing of pipes shall be with 1:2 cement and course sand mortar.
7.5
1900
14250
... More
Brick edging on both sides of roads of 1st class brick 8cm (3") wide & 12cm (4.50") deep laid with mud mortor including labour & suplly of bricks finished to required templete and in proper alignment and also including dressing & ramming the excavated earth including all labor T&P sudries required for completion of work with material.
0.1
82000
8200
... More
Maintenace cost of 2nd year after completion of work @2.00% of total work amount of item no 1 to 8 (Part-A)
1
14761
14761.87
... More
Maintenace cost of 3rd year after completion of work @3.00% of total work amount of item no 1 to 8 (Part-A)
1
22142
22142.81
... More
Maintenace cost of 4th year after completion of work @ 4.00% of total work amount of item no 1 to 8 (Part-A)
1
29523
29523.75
... More
Maintenace cost of 5th year after completion of work @ 6.00% of total work amount of item no 1 to 8 (Part-A)
1
44285
44285.62
... More
Providing & laying spreading and compacting stone aggregates of specifice size to water bound macadam specification including spreading in uniform thickness hand packing rolling with three wheel 80-100 Kn static roller in stages to proper grade and camber appling and brooming crushable screening to fill-up the interstice of coarse aggregate watering and compacting to the required density Grading 3 as per Technical specification (for Interlocking Base coat)
18
3836
69062.4
... More
Providing and Laying cement concrete 1:6:12 (1 cement :6fine sand :12graded brick aggregate 40mm nominal size) including supply of all materials, labour, T&P, Curing, Cost of form work complete in all respect in foundation and under floor (SI No. 273
4.8
3950
18960
... More
M-150 class brick work in 1:4 Cement and course sand mortar in foundation and plinth including supply of all materials labour and tools and plants etc. requried for proper completion of the work. As per direction of Engineer in charge (SI No. 6.1.1)
11.04
5390
59505.6
... More
Supply and laying of 80mm thick grey mccnanically compressed interlocking cement concrete paver blocks manufactured by high pressure and controlled vibration machine having minimum 5 mm thick topping of cement mixed with 20% marble powder the compressive strength of concrete paver bloks shall not be less than 30MPa & 4.50 Kg an I.S.I marked as per drawing and confirming to RC-SO-63-2004 over etc.& also including 25mm Local sand cushion below Interlocking Block as per drawing .................. required for proper completion of the work. Clause 1504 Excluding GSB ( S.No 16 page 40)
240
950
228000
... More
Laying C.C. consisting of 1:2:4 cement, course sand and approved 2 cm gauge stone ballast over prepared sub grade after its rectifications and bringing its to proper camber and including supply of all material .............. complete in all respect
1.6
7850
12560
... More
12mm thick plaster 1:4 cement and coarse sand mortar over brick work including supply of all materials, labour and T&P etc. required for proper completion of work. 155+22= 177 Diff. (S.I. (583-582)
48
177
8496
... More
Earth Work in excavation in trenches for foundation and pipe, cable etc. in ordinary soil (Loan clay or sand) including lift upto 1.5M lead upto 50M and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by engineer in charge with in a lead of 50 meter. I/C Royality (SI251)
12
125
1500
... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. ( With Royalty)
48
258
12422.4
... More
Maintenace cost of 2nd year after completion of work @ 0.25% of total work amount of item no 13 to 20 (Part-B)
1
1026
1026.27
... More
Maintenace cost of 3rd year after completion of work @ 0.50% of total work amount of item no 13 to 20 (Part-B)
1
2052
2052.53
... More
Maintenace cost of 4th year after completion of work @ 0.75% of total work amount of item no 13 to 20 (Part-B)
1
3078
3078.8
... More
Maintenace cost of 5th year after completion of work @ 1.00% of total work amount of item no 13 to 20 (Part-B)
1
4105
4105.06
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements