Rajya Krishi Utpadan Mandi Parishad Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date17 Apr 2025
Closing Date10 May 2025
Tender Amount₹ 2,50,50,000 
Notes
Download

AI Insights

Class Of Bidder
... View More
The class eligibility requirement to bid or participate in this tender is Category A, B, or C of contractor.
Bid Capacity
... View More
The formula for bid capacity is: Assessed Available bid capacity = A x N x M, where A = maximum value of civil Engineering Work executed in any one year during the last five years, N = Number of years prescribed for completion of the works for which tenders are invited, M = 20.
Technical Capacity
... View More
The bidder should have completed similar works with a value of at least the total bid value. No specific percentage of similar works completed is mentioned. The bidder's experience in executing civil engineering works is assessed based on the maximum value of work executed in a year. The value of the work is mentioned as 250.50 Lac Rs. No specific amount or percentage is mentioned for similar works completed, but the bidder's experience and capacity are assessed based on their past work and current commitments. Tenders from skilled and experienced contractors who submitted proofs of having successfully carried out similar work only can be considered.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregate of specified grading, premixed with bituminous binder@ 4.5 to 5 per cent of mix amd filler, transporting the hotmix to work site, laying with a hydrostatic paver finished with sensor control to the required grade,level and alignment,rolling with smooth wheeled,viberatory rollers to achieve the desired compaction as per MORT& H specification clause 508 complete in all respect.

515.88

10810

5576662.8

... More
Dismantling of interlocking tiles including stacking of old tile assi no dsr no16.83 131.75*0.7597= 98.77

273.5

99

27213.25

... More
Laying of interlocking tiles of 80 mm thick including levelling and dressing of surface up to required level and slope and filling joints with fine sand including cost of fine sand ,labour,t&petc complete but excluding cost of tile as directed by engineering in charge as si no SOR 20.13

136.75

108

14892.08

... More
Laying of interlocking tiles of 80 mm thick C.C. Paver Block M-35including levelling and dressing of surface up to required level and slope filling joints with local sand including costof tiles ,labour t&p etc complete as directed by e/I 1091.50*0.7497= 824.70 DSR 16.91.2

136.75

824

112682

... More
16.62 Providing and applying 2.5 mm thick road marking strips (retroreflective)of specified shade/ colour using hot thermoplastic materialby fully/ semi automatic thermoplastic paint applicator machine fittedwith profile shoe, glass beads dispenser propane tank heater andprofile shoe heater, driven by experienced operator on road surfaceincluding cost of material, labour, T&P, cleaning the road surface ofall dirt, seals, oil, grease and foreign material etc. complete as perdirection of Engineer-in-charge and accordance with applicable specifications. sqm 623.80 747.80*0.7497= 565.00 (DSR 2023)

527

565

297755

... More
Dismantling reinforcedcement concrete or reinforcedbrickwork including stacking of material as directed by the e/I with in a distance of 60 meter (200FEET) 694

110.18

1326

146175.81

... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. S.I. No. 251

1178.34

108

128321.23

... More
Concrete with 4 cm. Gauge Stone ballast fine sand nd cement in proportion of 12:6:1 in foundation and under floor and including supply of II material labour and T&P etc required for proper completion of the work. S.I. no 275 273(A)

152.96

5247

802581.12

... More
Reinforced cement concrete work in wall (any thickness), including attached pilasters buttersses plinth and string course filletes coloums pillar, piers abuttment, posts and struts etc above plinth leveln up to floor five levels, excluding costs of centering shuttering finishing and Reinforcement 1:1.5:3 cement, csand, grift dsr 5.2.2 10852.95*0.7497 = 8136.45

318.97

8200

2615554

... More
Centering Shuttering including strutting propping etc and removal of form for walls (any thickness) including attached pilaster buttersses plinth and string courses filletes coloums pillars,piers abuttment posts and struts etc. DSR No 5.9.2 842.50*0.7497 = 636.59

1915.2

636

1218067.2

... More
Providing & placing in postion 100 mm thick factory made machine batched&machine mixed precasts Rcc Rectangular covers on drain of foothpath of various size of m25 grade cement concrete for rcc work including cost of centering shuttering Reinforcement of 8mm dia tmt bars of fe500grade @maximum 100mmc/c on both way, neat cement punning on finnished surface properly encased on alledge with 1.6mm thick 100mm wide ms sheet duly painted over primint coat, reinforcement to be welded at edges with ms sheet and providing 2nos 12 DSR NO 16.93 3081.95*0.7497 = 2320.54 16.93

630

2328

1466640

... More
R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab excluding supply of reinforcement and its bending, but including its fixing and binding wire and including necessary centering & shuttering etc. (S.I. No. 284) NEW ITEM SOR

63.75

8940

569925

... More
M S T or Steel or Iron Work in Plain Work Such As Reinforcement of Reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and including the supply of steel and its waistage Bend, hooks, Binding wire and authorized over lapping shall be measured upto floor two level. (Chapter_10_Item_3)

325.45

8100

2636145

... More
PART-B The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 1st year maintenance cost@0.0%

1

-

-

... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25%

1

37723

37723.5

... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50%

1

75447

75447.1

... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75%

1

113170

113170.5

... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00%

1

150894

150894



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.