Rajya Krishi Utpadan Mandi Parishad Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date3 Jan 2025
Closing Date22 Jan 2025
Tender Amount₹ 56,85,000
Costs
EMD
₹ 4,85,000Document Cost
₹ 10,150Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_988958_1Tender No
697/DDC Dt-31.12.2024Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
4312.5
15
66843.75
... More
Providing & applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means. Mord Book Page No. 123
4312.5
33
145762.5
... More
Proving , laying and rolling of open-graded premix by Mechnical Means carpet of 20 mm thikness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508.
4312.5
179
775818.75
... More
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type B as per Technical Specification Clause 510
4312.5
70
303168.75
... More
Earthwork in cutting or in embakement in ordinary soil ,excavation tobe in the form of regular pits not exceeding 0.50 m in depth and earth work in embakement to be in 20cm layers includding ramming and dressing the surface to required level and slopes and also including 1.5m lift and 30m lead , the earth from cutting to be issued in making embakement or to be dipositedas spoil bank with in 30 m distance as directed bye/i
1472
99
145728
... More
Providing and fixing rectro reflective sign board as per drawing approved by H/QAS PWD 22.42
1
15000
15000
... More
BRICK edging on both side of the road of firstclass brick 7cm wide 11cm deep laid with mud mortar including labour &supply of bricks finished to the required template and in proper alingment and also including of dressing and ramming the excavated earth as directed by the e/i as si 765
1.15
89108
102474.2
... More
Brick Soiling with straight over burnt brick laid on edge including prepration of subgrade brick laid on edge as SI No 763
100
589
58910
... More
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30M. and includingfilling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches.
23.1
108
2515.59
... More
Concrete with 4.0cm gauge stone ballast ,coarse sand ,and cement 12:6:1 in foundation and under floor ,including supply of all material .labour t&p si no 274A
6
5247
31485
... More
SUPPLY &LAYING OF350mm dia hume pipe jointing in postion jointed with jute & stiff mixture of cement mortar in the proption of 1:2(1cement:2fine sand )including testing of joints complete ,labour and t&pfor proper complection of work(1550+20%OF1550+19.06(II)=
22.5
2260
50850
... More
M150 class brick work in1:3 cement&c sand mortar in foundation &plinth SI NO307
15
5356
80346
... More
12mm thick cement plaster 1:3 cement&c sand mortar SI NO583
24.3
207
5051.97
... More
(PART-B) The Routine amintenance of above road work including earthen shoulder, and bitumenous pavement etc to required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in defined free condition during the entire maintenance period which begins from the Completion date and ends after five Years. (including cost od materials T & P Labour but Excluding GST) for 1st Year Maintenance cost @ 0.0%
1
-
-
... More
17.1 The Routine amintenance of above road work including earthen shoulder, and bitumenous pavement etc to required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in defined free condition during the entire maintenance period which begins from the Completion date and ends after five Years. (including cost od materials T & P Labour but Excluding GST) for 2nd Year Maintenance cost @ 0.75%
1
39665
39665.3
... More
17.2 The Routine amintenance of above road work including earthen shoulder, and bitumenous pavement etc to required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in defined free condition during the entire maintenance period which begins from the Completion date and ends after five Years. (including cost od materials T & P Labour but Excluding GST) for 3rdYear Maintenance cost @ 1.50%
1
79330
79330.6
... More
17.3 The Routine amintenance of above road work including earthen shoulder, and bitumenous pavement etc to required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in defined free condition during the entire maintenance period which begins from the Completion date and ends after five Years. (including cost od materials T & P Labour but Excluding GST) for 4th Year Maintenance cost @ 2.25%
1
118995
118995.9
... More
17.4 The Routine amintenance of above road work including earthen shoulder, and bitumenous pavement etc to required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in defined free condition during the entire maintenance period which begins from the Completion date and ends after five Years. (including cost od materials T & P Labour but Excluding GST) for 5th Year Maintenance cost @ 3.0%
1
158661
158661.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements