Rajya Krishi Utpadan Mandi Parishad Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date7 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 44,49,308.19 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 4,23,000Document Cost
₹ 7,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_989456_1Bid Award Id
ViewTender No
N.K./Lko/E-Nivida/2025-1769 Dated 02.01.2025Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.7-1.0kg/sqm using mechanical means as per Technical specification clause 502
2700
35
96660
... More
Providing and applying tack coat with Bitumen VG-10 BULK using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
2700
15
42390
... More
Providing, laying and rolling of open graded mix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or imulsion to required line, grade and level to serve as wearing course on apreviously prepared base , including mixing in a suitable plant, laying and rolling with a three wheeled 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of type C as per Technical specification clause 508
2700
192
520830
... More
Providing, and laying sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using type C as per Technical specification clause 510
2700
70
191160
... More
Brick edging on both sides of the road with M-150 bricks 8 cm wide and 11.5 cm deep laid with mud mortar including cost of bricks all labour finished to be required template and in proper alignment T&P and also including dressing and ramming the excavated earth as per direction of Engineer in Charge. (SINo. 765)
0.9
96000
86400
... More
Supply & laying of 300mm dia N.P.-3 class Hume pipes in position and proper alignment including supply of all materias, labour and T&P etc. required for proper completion of work.(N.S)
22.5
1060
23850
... More
Providing and fixing of Recto reflective steel sign board as per drawing design including writing of details as specified by Engineer in charge. including supply of all materials, labour T&P, cartage upto site complete in all respect required for proper completion of the work and as per direction of E/I.
1
8000
8000
... More
Excavation in foundation in ordinary soil (loam, clay or sand) including lift up to 1.5M and lead up to 50M. and including filling, watering and ramming of the excavated earth into the trenches or into the space between the building and the sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto a distance of 50M. from the foundation trenches.(MORD-302 (3.5)-1)
18.79
120
2254.8
... More
Providing and laying of cement conrete 1:6:12 (1 cement: 6 Coarse sand : 12 graded brick aggregte 40 mm nominal size ) including curing, supply of all material, labour, T&P etc complete in all respect required for proper completion of the work. (DAR 273)
2.21
4520
9989.2
... More
Brick Masonary work in cement mortar & Coarse sand 1:4 in Foundation and Plinth complete excluding pointing and plastering as per drawing and technical specification Clauses (DAR 6.1.1).
5.68
6300
35784
... More
Providing and laying reinforced cement concrete pipe NP3 600mm dia for culverts first class bedding of granular material including fixing with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary works in head walls and paracets clause (MORD-1100(9.3).
7.5
2386
17895
... More
Providing and laying of cement conrete 1:2:4 (1 cement: 2 Coarse sand : 4 graded brick aggregte 20 mm nominal size ) including curing, supply of all material, labour, T&P etc complete in all respect required for proper completion of the work. (DAR-4.1.3)
0.11
7375
811.25
... More
Pointing with cement mortar (1:3) on brick work in substructure as per technical specifications. (MORD-600 (12.2))
18.52
104
1926.08
... More
Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop standing tree at adjacent to road wherever cutting of branches of tree, shurb and trimming of grass and weeds etc mentioned in GO No. 55 12022 /187/23-9-2022-02 Nabard / 2021 Dt 28.04.20022 & Enc lettere no 14 BDD-1 (NH)/40 MT-11/ 2024dated 03.01.2024 subjected to approval from Govt. Maintence of 1st year after completion of work @ Zero % first Year (@ 0.00% of cost of work
1
-
-
... More
Maintenance cost of 2nd year @1.00% Total cost of work P.C. Area
1
33784
33784.13
... More
Maintenance cost of 3rd year @1.50% Total cost of work P.C. Area
1
50676
50676.19
... More
Maintenance cost of 4th year @2.00% Total cost of work P.C. Area
1
67568
67568.25
... More
Maintenance cost of 5th year @3.00% Total cost of work P.C. Area
1
101352
101352.38
... More
Earthwork excavation in foundation in ordinary soil (load, clay or sand etc).
45
120
5400
... More
Providing , laying ,spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-0100 kN static roller in stages to proper grade and camber, applying and brooming , crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405
42.75
5230
223595.33
... More
Class 150 brick work in 1:4 cement and coarse sand mortar in foundation.
32.2
6300
202860
... More
Providing and laying of cement conrete 1:2:4 (1 cement:2 coarse sand : 4graded brick aggregte 20 mm nominal size ) including curing, supply of all material, labour, T&P etc complete in all respect required for proper completion of the work. (SI No 279)
6.08
7375
44840
... More
12mm thick cement plaster with cement mortarin propotion of 1:4 cement & coarsesand of single coat for interior rounded angles chamber and rounded angles not exceeding 80mm in girtfinished even and smooth.
140
192
26880
... More
Providing and laying of interlocking concrete block pavement having thickness 80mm as per drawing and technical specification clause 1504.
300
980
294000
... More
Maintenance cost of 1st year Total cost of work interlocking area (Sl. No. 23 to 28)
1
-
-
... More
Maintenance cost of 2nd year @0.25% Total cost of work interlocking area (Sl. No. 23 to 28)
1
1993
1993.94
... More
Maintenance cost of 3rd year @0.50% Total cost of work interlocking area (Sl. No. 23 to 28)
1
3987
3987.88
... More
Maintenance cost of 4th year @0.75% Total cost of work interlocking area (Sl. No. 23 to 28)
1
5981
5981.81
... More
Maintenance cost of 5th year @1.00%Total cost of work interlocking area (Sl. No. 23 to 28)
1
7975
7975.75