Rajya Krishi Utpadan Mandi Parishad Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date4 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 30,41,175
Costs
EMD
₹ 3,05,000Document Cost
₹ 5,400Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_989392_1Tender No
18/2024-25Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using machanicals means as per technical specification clause 502 including cost of bitumen emulsion(SS-1)
2400
34
83760
... More
Providing and Applying tack coat with bitumen (VG-10) using Bitumin pressure distributor at the rate of 0.30kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503 including cost of bitumen (VG-10)
2400
15
37200
... More
Providing, Laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity finished to required level and grades to be followed by seal coat as per technical specification clause 508 including cost of bitumin (VG-10)
2400
203
488400
... More
Providing and Applying seal coat sealing the voids in a bituminous surface laid to the specified level grade and cross fall using type “C” as per Technical Specification clause 510 including cost of bitumin
2400
73
175200
... More
Brick edging on both sides of the road of frist class bricks 8.0 cm (3”) wide and 12cm (4.5”) deep laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing, ramming excavated earth as directed by E/I. as per SI No- 765
0.8
64550
51640
... More
S/F of 350 mm dia R.C.C Hume pipe (For Pipe)
15
1190
17850
... More
S/F of 350 mm dia R.C.C Hume pipe (For Coller)
4
315
1260
... More
S/F of 350 mm dia R.C.C Hume pipe(For Labour)
6
340
2040
... More
S/F of Reflective Sign Board, etc
1
15000
15000
... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%
1
-
-
... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 1%
1
28290
28290
... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.5%
1
42435
42435
... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.0%
1
56580
56580
... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.0%
1
84870
84870
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%