Rajya Krishi Utpadan Mandi Parishad Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date4 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 47,44,824 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and Applying seal coat sealing the voids in a bituminous surface laid to the specified level grade and cross fall using type “C” as per Technical Specification clause 510 including cost of bitumin

3750

71

267375

... More
Providing and Applying tack coat with bitumen (VG-10) using Bitumin pressure distributor at the rate of 0.30kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503 including cost of bitumen (VG-10)

3750

15

58125

... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%

1

-

-

... More
S/F of Reflective Sign Board, etc

1

12000

12000

... More
WBM G-3 Providing and Laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required density as per technical specification clause 405

281.25

4817

1354865.63

... More
Earthwork in cutting or embankment/patri in ordinary soil ( loam,clay or sand) excavation to be done in the form of regular pits not exceeding 0.50m in depth and earthwork in embankment to be in 20 cm layer including the remming and dressing the surface to required levels and slopes and also including 1.50 meter lift and 1000 metr lead as directed by E/I including labour T&P etc required for proper completion of work as per (Sl.No. 253).

1800

100

180000

... More
S/F of 350 mm dia R.C.C Hume pipe(For Labour)

6

340

2040

... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.5%

1

66206

66206.84

... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.0%

1

132413

132413.69

... More
S/F of 350 mm dia R.C.C Hume pipe (For Pipe)

15

1190

17850

... More
WBM G-2 (inter coat) Providing and Laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening/binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required density grading -2 as per technical specification clause 405

304.54

4604

1402223.98

... More
S/F of 350 mm dia R.C.C Hume pipe (For Coller)

4

315

1260

... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 1%

1

44137

44137.9

... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.0%

1

88275

88275.79

... More
Brick edging on both sides of the road of frist class bricks 8.0 cm (3”) wide and 12cm (4.5”) deep laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing, ramming excavated earth as directed by E/I. as per SI No- 765

1.25

64550

80687.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.