Rajya Krishi Utpadan Mandi Parishad Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date17 Apr 2025
Closing Date10 May 2025
Tender Amount₹ 60,85,000
Costs
EMD
₹ 5,10,000Document Cost
₹ 10,856Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_1028524_1Tender No
730/DDC Dt-15.04.2025Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing & applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. Mord Book Page No. 123
3562.5
34
121481.25
... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
3562.5
15
54506.25
... More
Providing , laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant laying and rolling with a three wheel 80-100 kn static roller capacity finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508.(MECHANICAL MEANS)
3562.5
179
638400
... More
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type B as per Technical Specification Clause 510
3562.5
70
249731.25
... More
Earth Work in cutting or in Embankment to be in the from regular pits not exceeding 0.5 cm in depth and earth work in embankment to be in 20 cm layers including ramming and dressing the surface and also uncluding 1.50 M lift and 30 m lead the earth from cutting to be used in making embankment or to be deposite as spoil banks wiyh on 30 m Distance as directed by the Enginer-in-Charge and Royalty No-253)
950
99
94050
... More
BRICK edging on both side of the road of firstclass brick 7cm wide 11cm deep laid with mud mortar including labour &supply of bricks finished to the required template and in proper alingment and also including of dressing and ramming the excavated earth as directed by the e/i as si 765
0.95
89108
84653.46
... More
Providing and fixing rectro reflective sign board as per drawing approved by H/QAS PWD 22.42
1
15000
15000
... More
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches.251(a)
23.1
108
2515.59
... More
Concrete with 4.0cm gauge stone ballast ,coarse sand ,and cement 12:6:1 in foundation and under floor ,including supply of all material .labour t&p si no 274A
6
5247
31482
... More
SUPPLY &LAYING OF350mm dia hume pipe jointing in postion jointed with jute & stiff mixture of cement mortar in the proption of 1:2(1cement:2fine sand )including testing of joints complete ,labour and t&pfor proper complection of work(1550+20%OF1550+19.06(II)=
22.5
2256
50760
... More
M150 class brick work in1:3 cement&c sand mortar in foundation &plinth SI NO307
15
5118
76782
... More
12mm thick cement plaster 1:4 cement&c sand mortar SI NO583
24.3
198
4811.4
... More
Earth work in filling with carted earth from 5 km out side from site including dressing watering & Ramming of earth as per directed by e/i
135
217
29403
... More
Constrution of unreinforced dowel jointed at expansion and thickness joint only, plain cement concrete. Pavement thickness as per designover a prepared sub base with 43 grade cement M 30 Grade as SI NO 20.14 (A)
112.5
7970
896625
... More
PART-B The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 1st year maintenance cost@0.0%
1
-
-
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25%
1
3785
3785
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 3nd year maintenance cost @ 0.50%
1
7570
7570
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 4nd year maintenance cost @ 0.75%
1
11355
11355
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 5nd year maintenance cost @ 1.00%
1
15140
15140
... More
PART-C The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 1st year maintenance cost@0.0%
1
-
-
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75%
1
31627
31627.5
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 3nd year maintenance cost @ 1.50%
1
63255
63255
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 4nd year maintenance cost @ 2.25%
1
94882
94882.5
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 5nd year maintenance cost @ 3.00%
1
126510
126510
Evaluation Notes How It Works ?
Potential Partner