Rajya Krishi Utpadan Mandi Parishad Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date24 Feb 2025
Closing Date10 Mar 2025
Tender Amount₹ 28,59,000
Costs
EMD
₹ 2,86,000Document Cost
₹ 5,075Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_1010146_1Tender No
tendershamli2025Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing & applying Primer coat with bitumen emilsion (SS-1) on surface of granular base including cleaning of road surface and spraying at the rate of 0.90-1.2 kg/Sqm using mechanical means as per technical Specfication Clause 502
4050
42
173340
... More
Providing & applying Tack coat with bitumen VG-10 grade using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503
4050
15
60750
... More
Providing laying and rolling of open-graded premix carpet of 20 mm thikness composed of 13.2 mm to 5.6 mm aggregates either usingpenetration grade bitumen VG-30 to required line, grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either type C as per Technical Specification clause 508 (Primixing work Maniacal Mechanical Paver finisher) MORD Specification clause 508
4050
161
654885
... More
Providing & laying seal coatby manual means with 80/100 grade bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification clause 510
4050
60
246240
... More
Construction of 2 cm gauge approved stone grit, coarse sand & cement in proporation of 1:1.5:3 in CC pavement cement coarse sand & fine aggregate mixture/plant of not less then 0.2 cum capacity & appropriate weight batcher using approced mix design, laid in approved fixed form work (Steel) channel) laying and fixing of 125 micron thick polyhene film. wedhes, steel plates including leveling the form work spreading the concrete with shovels rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion clothe for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all materilas, labour T&P etc required for proper complection of the work and also including complete shifting of recron 38 fibre reinforcement materilas New Item 9
45
7227
325246.5
... More
Excavation in foundation in ordinary soil including lead upto 30 meter and lift upto 1.5 meter and including of excavated earth in to the trenches or in to the sapce of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed E/I (S.I. No. 251A)
25.05
89
2231.96
... More
M-150 Brick Work in 1:4 cement & Coarse sand in foundation and plinth including supply of all materials labour tools & plants etc S.I No. 305a
13.8
4643
64080.3
... More
Plain Cement concrete 1:2:4 Cement coarse Sand & 2cm gauge Stone grit etc.S.I. No. 279
2.3
5693
13093.9
... More
Supply & laying and fixing 600 m.m Dia NP3class R.C.C humepipe including joining etc complete. Ana
15
2371
35565
... More
BOE on edge dry i/c supply of all material labour and t&p etc required for proper completion of the work (SI NO 762 B)
45
371
16708.5
... More
Supplying & Fixing of retro reflective sign board with a corrosion resistant 4 mm thick aluminium composite panel (HIP type IV) as per approved design & drawing. Retro Reflective (HIP type IV) sign board warranty upto 7 years. Rate includes fabrication, supply of materials, transportation and erection of the signage structure for proper completion of work. Saction rate Moradabad at HQ
1
13390
13390
... More
(PART-B) The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 1st Year maintenance cost@0.0%
2349846.97
-
-
... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 2nd Year maintenance cost@0.75%
1
17623
17623.85
... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 3rd Year maintenance cost@1.50%
1
35247
35247.7
... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 4th Year maintenance cost@2.25%
1
52871
52871.55
... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 5th Year maintenance cost@3.00%
1
70495
70495.4
... More
(PART-B) For 100 Metre Cement Concrete Road Work The routine maintenance of above road work including earthen shoulder, Cement Concrete PavementPavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 1st Year maintenance cost@0.0%
325246.5
-
-
... More
The routine maintenance of above road work including earthen shoulder,Cement Concrete Pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 2nd Year maintenance cost@0.25%
1
813
813.11
... More
The routine maintenance of above road work including earthen shoulder, Cement Concrete Pavementetc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 3rd Year maintenance cost@0.50%
1
1626
1626.23
... More
The routine maintenance of above road work including earthen shoulder, Cement Concrete Pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 4th Year maintenance cost@0.75%
1
2439
2439.34
... More
The routine maintenance of above road work including earthen shoulder, Cement Concrete Pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 5th Year maintenance cost@1.00%
1
3252
3252.46
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements