Purvanchal Vidyut Vitaran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Purvanchal Vidyut Vitaran Nigam Limited - PUVVNL Tender

Works
Eprocure
Opening Date24 Jan 2019
Closing Date5 Feb 2019
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Repairing Of 10 Kva Damaged Transformer

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE

400

-

-

... More
Detanking of core and coil assembly , checking of transformer winding to assess the extent of damage.

-

-

-

400

-

-

... More
Cleaning, removing the rust of tank etc. of the repairable transformer and painting of inside of transformer tank with zinc chromate (Yellow) in two coats with spray painting machine. Zinc chromate (Yellow) shall be supplied by the contractor.

-

-

-

400

-

-

... More
Dismantling of core and coil assembly, opening of top yoke core, lamination. Removing of HV and LV Leg coils for assessing its reuse, reuse of major insulating material if possible, checking and recording of physical dimensions of coil.

-

-

-

400

-

-

... More
‘‘Making of complete HV & LV leg Alu. Leg coils identical to original one with same number of turns, weight etc providing super enameled / DPC conductor/ Strip confirming to IS 1971 /53 in place of old and damage coil. Alu. coil, wire strip will be provided by the department. All coil assembly of identical voltage shall be interchangeable without requiring any special equipment. Coil shall be supported between adjacent sections by insulations, spacers, beamers and other insulations.Rewinding shall be arranged to ensure free circulation of oil to reduced hot spots in winding. The insulation of coil shall be treated with suitable insulating, varnish or equivalent compound to develop the full electrical strength of winding as per original design.

-

-

-

4400

-

-

... More
Assembly of core and coils and fitting of top yoke and other parts. Replacement of insulation such as press board, craft paper, making support between adjacent section by insulating spacers and wrapping etc. shifting of repaired core coil assembly and placement inside the oven for proper dry out.

-

-

-

400

-

-

... More
Taking out the core coil assembly from oven and shifting the same in assembly yard. Connection of HV Coils and its delta formation, LV connection and its star formation. Fixation of insulating material wherever necessary. Tanking out leads fortap changer contact surface between movable and fixed contacts, tap changer should operate smoothly and there should be no gap between fixed and moving contacts.

-

-

-

400

-

-

... More
Retanking of core and coil assembly.

-

-

-

400

-

-

... More
Fitting of complete accessories of H.T. & L.V. Bushing and Bushing Rod on H.V. & L.V. side of transformer.

-

-

-

400

-

-

... More
Boxing up of repaired transformer including filling of gaps when necessary.

-

-

-

400

-

-

... More
Refilling of reclaimed transformer oil having sufficient dielectric strength and IR Value. Shifting the transformer to testing yard.

-

-

-

400

-

-

... More
Testing the correctness of connection, DVDF, No load, load loss test (where available), High Voltage, impedance voltage, Short Circuit and open circuit test, Voltage ratio and redraging and stacking at identified place in the yard.

-

-

-

400

-

-

... More
Punching and welding of M.S. Plate on outside of transformer of size 100 x 50 mm x 3 mm on out side of transformer body. M.S. plate shall be supplied by the contractor. The detail of punching should be as below : (1) Name of Workshop (2) Name of Contractor (3) Agreement No. & Date. (4) Date of repair (5) Capacity (6) Unque No.

-

-

-

400

-

-

... More
Painting outside of the tank by synthetic enamel paint of smoke grey shade in two coats after providing red oxide primer. Red oxide primer and synthetic enamel paint shall be provided by the contractor.

-

-

-

400

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.