Purvanchal Vidyut Vitaran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Purvanchal Vidyut Vitaran Nigam Limited - PUVVNL Tender
Civil And Construction
Electrical and Electronics
Water Storage And Supply
Electrical Works
Eprocure
Opening Date13 Jul 2024
Closing Date22 Jul 2024
Tender Amount₹ 42,30,000
Costs
EMD
₹ 84,600Document Cost
₹ 5,310Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PVVNV_938088_1Bid Award Id
ViewTender No
05/TMKM/EC/2024-25Tender Authority
Purvanchal Vidyut Vitaran Nigam Limited ViewPurchaser Address
-Website
http://http://puvvnl.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dismantling of 11 KV overhead Line after completion of Mela period or as per instruction of mela administration and carriage back complete line material to Mela store.
10
-
-
Construction of section double pole for 11kv line on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/angles/G.O, painting and earthing etc.
4
-
-
Construction of section four pole for 11kv line on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/ angles, Plinthing, painting and earthing etc.
1
-
-
Laying of XLPE cable 3x120/3x185 Sq.mm. in mela area and Pantoon bridge in 4'' HDPE pipe including carriage of materials from Mela store to Mela work site and after dismantling return back all the materials from site to Mela store.(HDPE Pipe provided by contractor on rental basis)
1800
-
-
Erection of 9/11 M Long STP single pole for hanging 3x120/185 sqmm 11 KV XLPE cable including fixing of necessary clamps, other accessories like 1 no. T-Off channel 125x65x1300 mm/top channel size 100x50x3200 mm etc.
20
-
-
Hanging of XLPE cable 3x120/3x185 Sq.mm along with stay wire 7/10 SWG on erected pole including carriage of materials from Mela store to Mela work site and return back all the materials to Mela store after dismantling and completion of Mela.
500
-
-
Fixing of H.S. type 11 KV 3x185 sq mm S/T cable joints & End Terminations.
4
-
-
Fixing of H.S. type 11 KV 3x185 sq mm O/D cable joints & End Terminations with proper connection to overhead line.
8
-
-
Construction of double pole and installation of 100 kva t/f on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/with bracing angles, substation base angle ,G.O, D.O.
6
-
-
Earthing of transformer body, neutral and L.T cubical and dismantling after mela.
6
-
-
Laying/hanging of L.T cable 3½x70/150 Sqmm or equivalent size cable from transformer to main switch of tube well in mela area.
300
-
-
Construction of 11/0.4 KV, 2x400 KVA Temporary Sub-Station & Laying of L.T. Cable including connection of RMU Wherever required in Concern area for Electrification work of Kumbh Mela 2024-25 and its maintenance during Mela period. This also include dismantling of the material after Mela including loading, carriage and unloading of material from Kumbh mela Store to site of work and return back to Mela Store after Mela.
-
-
-
Construction of four pole structure on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/ angles, painting and earthing etc and Installation of G.O. 4 Nos. D.O. 2 Nos. fittings, making of Busbar on the top portion of structure with cutting, fabrication and mounting of channel/Angle on four pole.
1
-
-
Construction of T/f plinth of size 1.5x1.5.x1.25 Mtr. with Ist class bricks of 0.95 meter height and 0.35 meter thick wall will be constructed. Rest wall should be 0.23 meter thickness. brick work will be in ratio of 1:4 Cement and sand. In the hollow portion the sand should be filled from ground level upto 15 cm. below from the top of plinth. The cement, sand and stone ballast should be placed in ratio 1:2:4 and 2 nos. channels be grouted in the concrete. The T/f plinth should be plastered on all sides by 12mm thick in 1:6 Cement, and mortar.
2
-
-
Installation of 400 KVA Transformer on plinth and making all HT/LT connections from transformer to L.T Tailless unit and earthing of transformer.
2
-
-
Installation of Tailless Unit by providing structure of channels with the help of 3/4 meter long M.S. Channel including mounting of 12 to 16 Nos. Tailless Unit 500/300 Amps. Also making of copper bus bar and its tapping, and earthing of structure by earth rod at two Point
1
-
-
Making of foundation plinth for D.G. Set of Size 14x4 ft. with the help of 1st Class Brick and its plastering with cement and Sand in ratio 1:6 which includes fixing of Change Over Switch on Sub Station Angle size 65x65x6 mm and its proper connection.
1
-
-
Bamboo barricading around four pole, Tailless unit and transformer plinth for safety purpose including its painting.(All materials will provided by contractor.)
1
-
-
Brick barricading, singhara with bricks and painting alternatively with Geru and Lime.(All materials will provided by contractor.)
1
-
-
Operation of above 11/0.4 KV, 2x400 KVA substation during Maha kumbh Mela 2024-25 round the clock from the date of energisation with the help of skilled operating staff (Operating Staff will be provided by the contractor). Two no. skilled manpower must be in each shift and minimum 3 shifts must be performed everyday)
1
-
-
Fixing of Fire bucket stand with four nos. buckets including its grouting and two no fire extinguisher at various sub-station in Kumbh Mela 24-25.
1
-
-
Laying of L.T. PVC cable 3.5x400 sq mm or equivalent size which also include maintenance and dismantling of cable after Mela.
80
-
-
Laying of L.T. PVC Cable 3 ½ x240 sq. mm. or equivalent size inside sand, which also includes maintenance and dismantling of cable after Mela.
500
-
-
Laying of L.T. PVC Cable 3 ½ x150 sq. mm. or equivalent size inside sand, which also includes maintenance and dismantling of cable after Mela.
100
-
-
Laying of L.T. PVC cable 3.5x 70 sq mm or equivalent size which also include maintenance and dismantling of cable after Mela including carriage from Mela Store to site of work and back carriage from site of work to Mela Store.
70
-
-