Purvanchal Vidyut Vitaran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Purvanchal Vidyut Vitaran Nigam Limited - PUVVNL Tender
Electrical and Electronics
Eprocure
Opening Date29 Jan 2024
Closing DateCancelled
Tender Amount₹ 59,80,000
Costs
EMD
₹ 59,800Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PVVNV_886767_1Tender No
81/EDC(M)/23-24Tender Authority
Purvanchal Vidyut Vitaran Nigam Limited ViewPurchaser Address
-Website
http://http://puvvnl.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
F-bracket with bolts & nuts for ST/PCC poles (Providing by Contractor)
240
-
-
Al. binding wire (Providing by Contractor)
3.5
-
-
M.S clamp for Top, T-off channel with bolts & nuts for ST/PCC poles (Providing by Contractor)
502
-
-
P.G clamps for weasel conductor (Providing by Contractor)
261
-
-
Danger board with clamp & bolts for ST/PCC poles (Providing by Contractor)
225
-
-
Barbed wire GI (Providing by Contractor)
54
-
-
E-bracket with bolts & nuts (Providing by Contractor)
42
-
-
160 mm OD PN-4 PE-80 Grade UV stabilized HDPE Pipe as per IS: 4984 in 6 meter (Providing by Contractor)
24
-
-
G.I pipe 6" dia (Providing by Contractor)
211
-
-
Jointer for G.I pipe 6" dia (Providing by Contractor)
48
-
-
All lugs 70/120 mm2 (Providing by Contractor)
288
-
-
Extention Bracket (Providing by Contractor)
108
-
-
I-Hook With Plastic Caver (Providing by Contractor)
216
-
-
Aluminium Paint (Providing by Contractor)
12
-
-
Bolt, Nut And Washer (Providing by Contractor)
12
-
-
Red Oxide Paint (Providing by Contractor)
12
-
-
LT Clamp with Nut Bolt (Providing by Contractor)
12
-
-
Earth Wire Clamp (Providing by Contractor)
12
-
-
Nut Bolt for Shackle Insulator (Providing by Contractor)
12
-
-
Loop Guard Complete 3 Phese (Providing by Contractor)
12
-
-
Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge.
-
-
-
ST Poles 11 mtr long (Provided by Department)
255
-
-
ST Poles 13 mtr long (Provided by Department)
4
-
-
PCC Poles 8.5 mtr long (Provided by Department)
203
-
-
Line materials with ACSR Weasel Conductor (Provided by Department)
21.43
-
-
Line materials with Dog Weasel Conductor (Provided by Department)
15.65
-
-
33 KV 3x300mm2 XLPE Cable (Provided by Department)
1050
-
-
33 KV 3x120mm2 XLPE Cable (Provided by Department)
1500
-
-
11 KV 3x300mm2 XLPE Cable (Provided by Department)
1932
-
-
11 KV 3x185mm2 XLPE Cable (Provided by Department)
7040
-
-
11 KV 3x120mm2 XLPE Cable (Provided by Department)
100
-
-
11 KV 3x70mm2 XLPE Cable (Provided by Department)
250
-
-
11 KV VCB O/G, 200/100/5A (Provided by Department)
6
-
-
Transformer 400 KVA (Provided by Department)
2
-
-
Transformer 100 KVA (Provided by Department)
12
-
-
Transformer 63 KVA (Provided by Department)
15
-
-
Transformer 25 KVA (Provided by Department)
43
-
-
Erection
-
-
-
Erection of single support ST/PCC pole for construction of 11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work.
418
-
-
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
462
-
-
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
102
-
-
Earthing of Poles
183
-
-
Stringing & sagging of 3 phase HT/LT line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering.
11.98
-
-
Erection of Sectional Double Pole Structure of ST pole including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets as per RESSPO norms (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
40
-
-
Erection of Sectional Double Pole Structure of PCC/ST pole including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets as per RESSPO norms (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
40
-
-
Erection of Sectional Double PCC/ST Pole Structure with the help of one pole already erected including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets as per RESSPO norms (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
40
-
-
Drill/cut of stone in hilly area for erection of pole
5
-
-
Mounting of 400 KVA Transformer as per RESSPO norms
2
-
-
Mounting of 100 KVA Transformer as per RESSPO norms
12
-
-
Mounting of 63 KVA Transformer as per RESSPO norms
15
-
-
Mounting of 25 KVA Transformer as per RESSPO norms
43
-
-
Laying of O/H 33 KV 3x300mm2 XLPE Cable as per RESSPO norms
990
-
-
Laying of O/H 33 KV 3x120mm2 XLPE Cable as per RESSPO norms
1460
-
-
Laying of O/H 11 KV 3x300mm2 XLPE Cable as per RESSPO norms
1810
-
-
Laying of O/H 11 KV 3x185mm2 XLPE Cable as per RESSPO norms
6080
-
-
Laying of O/H 11 KV 3x120mm2 XLPE Cable as per RESSPO norms
88
-
-
Laying of O/H 11 KV 3x70mm2 XLPE Cable as per RESSPO norms
212
-
-
Filling of I/D/O/D 33 KV cable jointing kit All size as per RESSPO norms
10
-
-
Filling of I/D/O/D 11 KV cable jointing kit All size as per RESSPO norms
48
-
-
Installation of 11 KV VCB pannel (O/G), 200/100/5A as per RESSPO norms
6
-
-
Testing & commissioning of O/G 11 KV swichgear as per RESSPO norms
6
-
-
Earthing for Indoor structure including 11 KV VCB pannel etc through boring till the water level with G.I Pipe & G.I strip and connect of all structure as per RESSPO norms
6
-
-
Drilling under the Railway Track by HDD machine for crossing the 11 KV XLPE cable
600
-
-
Laying of 160 mm OD PN-4 PE-80 Grade UV Stabilized HDPE Pipe as per IS:4984 in 6 meter with jointer
144
-
-
Laying charge of 33 KV All Size cable from D/P to D/P
5
-
-
Laying charge of 11 KV All Size cable from D/P to D/P
10
-
-
Cartage of received back 10 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
40
-
-
Cartage of received back 25 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
15
-
-
Cartage of received back 63 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
12
-
-
Cartage of received back 250 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge