Purvanchal Vidyut Vitaran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Purvanchal Vidyut Vitaran Nigam Limited - PUVVNL Tender

Works
Civil And Construction
Consultancy Services
Eprocure
Opening Date16 May 2018
Closing Date11 Jun 2018
Tender Amount₹ 25,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(c) ST Pole (SP-33) 9.0 Mtr.

-

1050

1050

... More
(d) ST Pole (SP-55) 11.0 Mtr.

-

1260

1260

... More
(e) ST Pole (18-72) 13 Mtr.

-

1470

1470

... More
(f) 90 lbs Rail 11 Mtr.

-

2625

2625

... More
Cartage of line material viz. weasel conductor, Rabbit, Dog, Stay Rod, Stay wire etc., G.I. wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends. Including the work of dragging etc. and also including the cost of labour. T&P carrier etc. required for proper completion of work. (o Km - 50 Km)

-

5250

5250

... More
Cartage of following Repaired/New Transformers from Store Centre or from any other place to the respective site of work through the Kachcha Pacca road including the work of its loading & unloading at the respective ends. Including the work of dragging etc. and also including the cost of labour. T & P carrier etc. required for proper completion work. (o Km - 50 Km)

-

-

-

... More
(a) 10/16 KVA Transformer

-

1386

1386

... More
(b) 25/63 KVA Transformer

-

2814

2814

... More
© 100/160 KVA Transformer

-

5250

5250

... More
(d) 250 KVA Transformer

-

13860

13860

... More
( e) 400 KVA Transformer

-

19425

19425

... More
(f) 630 KVA Transformer

-

22050

22050

... More
(g) 1000 KVA Transformer

-

52500

52500

... More
Cartage of damaged/defective Transformers of the following capacity from L.T. S/S to Central Store/Workshop through the Kachcha Pacca road including safe loading & unloading at the respective ends. Including the removal from the plinth/structure after opening the all cable connections. Work also include the cost of labour. T & P carrier etc. required for proper completion of work. (o Km - 50 Km)

-

-

-

... More
(a) 10/16 KVA Transformer

-

1386

1386

... More
(b) 25/63 KVA Transformer

-

2814

2814

... More
© 100/160 KVA Transformer

-

5250

5250

... More
(d) 250 KVA Transformer

-

13860

13860

... More
( e) 400 KVA Transformer

-

19425

19425

... More
(f) 630 KVA Transformer

-

22050

22050

... More
(g) 1000 KVA Transformer

-

52500

52500

... More
Safe cariage of following capacity Power Transformers including all accessories & Transformer oil from JE Store or from other places to work place distance within 50 Km. approximate including opening of radiators, conservator tank & other accessories required, required draining out transformer oil in drums & safe unloading at destination place and fitting of radiators, conservator tank & other accessories, filling of Transformer Oil safely. All T&P, crane, Trolla etc as required for safe carriage of Power Transformer is to be arranged by the Contractor. (o km - 100 km)

-

-

-

... More
(a) 5 MVA Power Transformer

-

157500

157500

... More
(b) 8 MVA Power Transformer

-

191835

191835

... More
© 10 MVA Power Transformer

-

220500

220500

... More
Shifting of following capacity damaged 33/11 KV Power Transformers from Plinths to suitable place outside of switch yard boundary with the help of crane (shifting distance 0 to 50 Meter). Work includes dismentalling of radiators after filling of transformer oil in the emply drums, opening of all connections & earthing, opening of PVC Cable from Power Transformer & Incoming Panel and shifting of radiators & filled drums to suitable place in switch yard. (o Km - 50 Km)

-

-

-

... More
(a) 5 MVA Power Transformer

-

52500

52500

... More
(b) 8 MVA Power Transformer

-

63000

63000

... More
© 10 MVA Power Transformer

-

73500

73500

... More
Contrifuging and filteration of following capacity 33/11 KV Power Transformers at destination Sub-Station including testing of transformer oil to give BDV not less than 60 KV when tested with 2.5 mm gap electrode.

-

63000

63000

... More
Erection and grouting of single support including complete H.T./L.T. fitting as per RESPO manual and as per direction of Engineer incharge including the cost of labour. T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand and brick ballast/ Stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, Stone pad etc. as per actual site requirement.

-

-

-

... More
(a) PCC Poles 8.5 Mtr.

-

1050

1050

... More
(b) PCC Poles 9.0 Mtr.

-

1050

1050

... More
(c) ST Pole (SP-33) 9.0 Mtr.

-

1260

1260

... More
(d) ST Pole (SP-55) 11.0 Mtr.

-

1470

1470

... More
(e) ST Pole (18-72) 13 Mtr.

-

1680

1680

... More
(f) 90 lbs Rail 11 Mtr.

-

2625

2625

... More
Erection and grouting of double pole including the work of complete H.T. fitting as per RESPO manual and as per direction of Engineer incharge including the cost of labour. T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand and brick ballast/ Stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, Stone pad etc. as per actual site requirement.

-

-

-

... More
(a) PCC Poles 8.5 Mtr.

-

2625

2625

... More
(b) PCC Poles 9.0 Mtr.

-

6615

6615

... More
(c) ST Pole (SP-33) 9.0 Mtr.

-

3150

3150

... More
(d) ST Pole (SP-55) 11.0 Mtr.

-

3675

3675

... More
(e) ST Pole (18-72) 13 Mtr.

-

3885

3885

... More
(f) 90 lbs Rail 11 Mtr.

-

7350

7350

... More
Erection and grouting of tri-pole including the work of complete H.T. fitting as per RESPO manual and as per direction of Engineer incharge including the cost of labour. T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand and brick ballast/ Stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, Stone pad etc. as per actual site requirement. Do not four Pole

-

-

-

... More
(a) ST Pole (SP-33) 9.0 Mtr.

-

3150

3150

... More
(b) ST Pole (SP-55) 11.0 Mtr.

-

4410

4410

... More
Carriage of XLPE Cable/ABC Conductor.

-

-

-

... More
(i) 3x300/400 33 KV

-

105

105

... More
(ii) 3x185/400 33 KV

-

105

105

... More
(iii) 3x120/400 33 KV

-

105

105

... More
(iv) 3x50/400 33 KV

-

105

105

... More
(v) 3x120/400 33 KV

-

105

105

... More
(vi) 3x70/400 33 KV

-

105

105

... More
(vii) 3x50/400 33 KV

-

105

105

... More
(viii) 3x35/400 33 KV

-

105

105

... More
Straightening of tilted pole at various places as per directinon of supervising Engineer including the cost of labour and T&P etc. required for proper completion work.

-

-

-

... More
(a) PCC Poles 8.5 Mtr.

-

1050

1050

... More
(b) PCC Poles 9.0 Mtr.

-

1575

1575

... More
(c) ST Pole (SP-33) 9.0 Mtr.

-

1050

1050

... More
(d) ST Pole (SP-55) 11.0 Mtr.

-

1050

1050

... More
(e) ST Pole (SP-72) 13 Mtr.

-

1050

1050

... More
(f) 90 lbs Rail 11 Mtr.

-

3150

3150

... More
Repairing of repairable damaged/rusted Steel Tubular poles at site by welding 4 Nos. MS Angle iron 50x50x6 mm, 700 mm long pieces and providing ring made of 50x6 mm MS Strip at both ends of angles duly welded with poles to strengthen the bottom of rotton poles and thereafter grouting of pole with cement, sand and brick ballast in ratio 1:4:8 as per RESPO schedule.

-

2625

2625

... More
Extension of 11 Meter long S.T. Pole to 13 Meter long S.T. Pole by fixing 2.5 meter long 5" dia, 4 mm thick MS pipe on the top of 11 meter long S.T. Pole, with proper fixing, jointing and welding including the cost of MS pipe.

-

5250

5250

... More
Installation of extra "T" on the erected poles wherever required along with all fitting as per direction of supervising Engineer including the cost of labour, T&P and carrier etc. required for proper completion of work. The "T" pole shall be grouted with cement, sand and brick ballast/ Stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.

-

3150

3150

... More
Re-tightening of stay complete with nozelling and binding, including cost of labour, T&P etc. required for proper completion of work.

-

910

910

... More
Erection and grouting of stay set including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, T&P etc. required for proper completion of work.

-

1960

1960

... More
Fixing of earthing rod as per RESPO manual and as per direction of supervising Engineer including the cost of labour, T & P etc. required for proper completion of work.

-

805

805

... More
Replacement of damaged pole by digging pits and dismantling all accessories from the existing/ damaged pole and erecting of single new pole including fitting all accessories including the cost of labour, T & P etc. required for proper completion of work.

-

-

-

... More
(a) Single Support of 8.5 Mtr. Long PCC Pole

-

2058

2058

... More
(b) Double Pole of 8.5 Mtr. Long PCC Pole

-

4095

4095

... More
(c) S.T. Pole (SP-33) 9.0 Mtr.

-

1680

1680

... More
(d) S.T. Pole (SP-55) 11 Mtr.

-

1680

1680

... More
(e) S.T. Pole (SP-55) 11 Mtr. Double Pole

-

3360

3360

... More
Dismantling and removal of existing conductor from the various area, stacking and placement their coils and their in the respective J.E.'s (Store) as per direction of supervising Engineer. It includes the work of cartage, the cost of labour, T & P etc. required for proper completion of work.

-

-

-

... More
(a) ACSR Weasel

-

2100

2100

... More
(b) ACSR Dog

-

2310

2310

... More
(c) ACSR Raccon

-

2310

2310

... More
(d) ACSR Rabbit

-

2310

2310

... More
(e) Damaged ABC Conductor

-

2310

2310

... More
Laying, sagging, stringing and binding and jumpering etc. of following on the newly erected Pole as per RESPO manual and as per direction of supervising Engineer. It includes the work of cartage, the cost of labour, T & P etc. required for proper completion of work.

-

-

-

... More
(a) ACSR Weasel

-

20292

20292

... More
(b) ACSR Dog

-

35616

35616

... More
(c) ACSR Raccon

-

34440

34440

... More
(d) ACSR Rabbit

-

32235

32235

... More
© Laying of ABC Conductor

-

-

-

... More
(i) 3x120 + 1x95 + 1x16

-

7350

7350

... More
(ii) 3x95 + 1x70 + 1x16

-

7140

7140

... More
(iii) 3x50 + 1x35 + 1x16

-

6930

6930

... More
Laying, sagging, stringing and binding and jumpering etc. of PVC insulated Following conductor on the newly erected pole as per RESPO manual and as per direction of supervising Engineer. It includes the cost of labour, T & P carrier etc. required for proper completion of work.

-

-

-

... More
(a) ACSR Weasel

-

20292

20292

... More
(b) ACSR Dog

-

44625

44625

... More
(c) ACSR Raccon

-

51660

51660

... More
(d) ACSR Rabbit

-

39060

39060

... More
Re-Sagging of following loose conductor as per direction of supervising Engineer. It includes the cost of labour, T & P carrier etc. required for proper completion of work.

-

-

-

... More
(a) LT Line

-

15351

15351

... More
(b) 11 KV Line

-

16306

16306

... More
(c) 33 KV Line

-

57435

57435

... More
Installation of following capacity transformers on the double pole structure in proper alignment and as per direction of superving Engineer/RESPO manual. It includes the cost of labour, T&P, carrier etc. required for proper completion of work.

-

-

-

... More
(a) 10/16 KVA Transformer Single Phase

-

3465

3465

... More
(b) 25 KVA Transformer

-

9313

9313

... More
© 63 KVA Transformer

-

13765

13765

... More
(d) 100 KVA Transformer

-

16327

16327

... More
(e) 160 KVA Transformer

-

17010

17010

... More
Construction of plinth size 5x5x4 above ground level and one ft. bellow the ground level of 9". After excavation of 4" earth, brick ballast shall be provided and rammering will be done properly. After that a retaining wall of 9" width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled upto one ft. below the top of the plinth. After this brick blast shall be provide 6" inch from the earth level and proper remmering shall be done. One no. jall of 12 mm MS for shall be fixed the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the tbe top of the plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work.

-

52500

52500

... More
Construction of 1.5 m high Barbed Wire Fencing, supply and erection of PCC Post of size 3"x3" at top and 5"x5" at bottom 2.0 m high, 2.0 m c/c imbeded in 1:3:6 concrete (20 mm nominal size of aggregate) block 450x450x600 mm. Corner post shall be struted on both sides and end post shall be struted on one side only. The contractor shall be responsible to complete the work as per direction of Superintending Engineer. It includes the cost of material, labour, T&P carriage etc required for proper completion of work.

-

4200

4200

... More
Installation of following capacity transformers on the Plinth in proper alignment and direction as per direction of superving Engineer/RESPO manual. It includes the cost of labour, T&P, carrier etc. required for proper completion of work.

-

-

-

... More
(a) 250 KVA Transformer

-

2100

2100

... More
(b) 400 KVA Transformer

-

3675

3675

... More
(c) 630 KVA Transformer

-

4200

4200

... More
(d) 1000 KVA Transformer

-

10500

10500

... More
(e) 5000 KVA Transformer

-

52500

52500

... More
(e) 10000 KVA Transformer

-

63000

63000

... More
Removal of following capactiy power transformer from the plinth as per direction of supervising Engineer/Respo Manual. It includes the cost of labour. T & P carrier etc. required for proper completion of work.

-

-

-

... More
(a) 5000 KVA Transformer

-

52500

52500

... More
(b) 10000 KVA Transformer

-

105000

105000

... More
Body and neutral earthing of 100 KVA and above transformer installed by digging of pit up to water level depth (approx. 100) and then inserting 1-1/4" dia GI Pipe of "B" Grade, conforming it the requirement of IS specification and then connecting the top of the inserted pipe and transformers body through GI strip of size 50x6 mm with the help of nut and bolt or through gas welding as per direction of supervising Engineer. It includes the cost of all materials, labourer, T & P, carrier etc. required for proper completion of work (please quote rate in Rft.)

-

26250

26250

... More
Providing of Bamboo sticks, suitable for 5 wire on the laid conductors as per direction of supervising Engineer. It includes the cost of Bamboo sticks, Binding wire labourer, T & P carrier required for proper completion of work.

-

12600

12600

... More
Giving connections to the genuine consumers by connecting cable through installed L.T. Distribution Boz, as per direction of supervising Engineer. It includes the cost of labour, T & P, carrier etc. required for proper completion work.

-

525

525

... More
Guarding of 11 KV Line at road crossing by laying two nos. GI wire parellel and fizing of lacing (tilli) at a dinstance at 2-3 mtr. As per direction of supervising Engineer/RESPO manual. It includes the cost of labour T & P carrier, etc. required for proper completion.

-

7350

7350

... More
Replacement of Jumper

-

-

-

... More
(a) LT

-

450

450

... More
(b) 11 KV

-

630

630

... More
(c) 33 KV

-

1050

1050

... More
Replacement of damaged following accessories

-

-

-

... More
(a) 11 KV Disc Insulator with Fitting

-

2835

2835

... More
(b) 11 KV Pin with Insulator

-

2310

2310

... More
(c) 11 KV X-Arm

-

525

525

... More
Note : In the above, rate of grouting are being fixed (based on cost data book-2007 by UPERC) as under, which may be taking into consideration including or excluding as mentioned in the above description.

-

-

-

... More
(a) ACSR Weasel

-

12600

12600

... More
(b) ACSR Dog

-

26250

26250

... More
(c) ACSR Raccon

-

24150

24150

... More
(d) ACSR Rabbit

-

23100

23100

... More
(a) PCC Poles 8.5 Mtr.

-

1050

1050

... More
(b) PCC Poles 9.0 Mtr.

-

2100

2100

... More
(c) ST Pole (SP-33) 9.0 Mtr.

-

1365

1365

... More
(d) ST Pole (SP-55) 11.0 Mtr.

-

1575

1575

... More
Safe Laying of 33 KV XLPE Cable of following size in cable trench by diging of cable trench of size 1050x750 mm. Work also include laying of 1st Class bricks along the length both side of 33 KV XLPE Cable Trench & on Top of the each cable including providing & filling river sand inside the brick and back filling of excavated earthin the cable trench upto the ground level and ramming properly.

-

-

-

... More
(i) 3x50 sq. mm.

-

231

231

... More
(ii) 3x70 sq. mm.

-

231

231

... More
(iii) 3x95 sq. mm.

-

231

231

... More
(iv) 3x120 sq. mm.

-

577

577

... More
(v) 3x150 sq. mm.

-

630

630

... More
(vi) 3x185 sq. mm.

-

630

630

... More
(vii) 3x240 sq. mm.

-

819

819

... More
(viii) 3x300 sq. mm.

-

840

840

... More
Safe Laying of 11 KV XLPE Cable of following size in cable trench by diging of cable trench of size 1050x750 mm. Work also include laying of 1st Class bricks along the length both side of 33 KV XLPE Cable Trench & on Top of the each cable including providing & filling river sand inside the brick and back filling of excavated earthin the cable trench upto the ground level and ramming properly.

-

-

-

... More
(i) 3x50 sq. mm.

-

220

220

... More
(ii) 3x70 sq. mm.

-

220

220

... More
(iii) 3x95 sq. mm.

-

220

220

... More
(iv) 3x120 sq. mm.

-

567

567

... More
(v) 3x150 sq. mm.

-

609

609

... More
(vi) 3x185 sq. mm.

-

609

609

... More
(vii) 3x240 sq. mm.

-

493

493

... More
(viii) 3x300 sq. mm.

-

819

819

... More
Removal of damaged HT cable and replacement/relaying of HT Cable of following size in different places :

-

-

-

... More
(i) 3x50 sq. mm.

-

200

200

... More
(ii) 3x70 sq. mm.

-

200

200

... More
(iii) 3x95 sq. mm.

-

200

200

... More
(iv) 3x120 sq. mm.

-

200

200

... More
(v) 3x150 sq. mm.

-

210

210

... More
(vi) 3x185 sq. mm.

-

210

210

... More
(vii) 3x240 sq. mm.

-

220

220

... More
(viii) 3x300 sq. mm.

-

220

220

... More
Providing and fixing of 11 KV INDOOR Heat Shrinkable Terminating & Jointing Kits of following size XLPE Cables after removing of damaged cable jointing kit as per RESPO norms.

-

-

-

... More
(i) 3x50 sq. mm.

-

6300

6300

... More
(ii) 3x70 sq. mm.

-

6720

6720

... More
(iii) 3x95 sq. mm.

-

6720

6720

... More
(iv) 3x120 sq. mm.

-

9450

9450

... More
(v) 3x150 sq. mm.

-

9450

9450

... More
(vi) 3x185 sq. mm.

-

10500

10500

... More
(vii) 3x240 sq. mm.

-

10920

10920

... More
(viii) 3x300 sq. mm.

-

21000

21000

... More
Providing and fixing of 11 KV OUTDOOR Heat Shrinkable Terminating & Jointing Kits of following size XLPE Cables after removing of damaged cable jointing kit as per RESPO norms.

-

-

-

... More
(i) 3x50 sq. mm.

-

6090

6090

... More
(ii) 3x70 sq. mm.

-

6510

6510

... More
(iii) 3x95 sq. mm.

-

6510

6510

... More
(iv) 3x120 sq. mm.

-

9240

9240

... More
(v) 3x150 sq. mm.

-

9240

9240

... More
(vi) 3x185 sq. mm.

-

10290

10290

... More
(vii) 3x240 sq. mm.

-

10710

10710

... More
(viii) 3x300 sq. mm.

-

20790

20790

... More
Providing and fixing of 11 KV STRAIGHT THROUGH Jointing Kits of following size XLPE Cables after removing of damaged cable jointing kit as per RESPO norms.

-

-

-

... More
(i) 3x50 sq. mm.

-

7350

7350

... More
(ii) 3x70 sq. mm.

-

7560

7560

... More
(iii) 3x95 sq. mm.

-

7560

7560

... More
(iv) 3x120 sq. mm.

-

9450

9450

... More
(v) 3x150 sq. mm.

-

9975

9975

... More
(vi) 3x185 sq. mm.

-

10500

10500

... More
(vii) 3x240 sq. mm.

-

15750

15750

... More
(viii) 3x300 sq. mm.

-

21000

21000

... More
Providing and fixing of 33 KV INDOOR Heat Shrinkable Terminating Kits for following size XLPE Cables after removing of damaged cable jointing kit as per RESPO norms.

-

-

-

... More
(i) 3x50 sq. mm.

-

9450

9450

... More
(ii) 3x70 sq. mm.

-

9450

9450

... More
(iii) 3x95 sq. mm.

-

10500

10500

... More
(iv) 3x120 sq. mm.

-

11025

11025

... More
(v) 3x150 sq. mm.

-

11550

11550

... More
(vi) 3x185 sq. mm.

-

12600

12600

... More
(vii) 3x240 sq. mm.

-

17850

17850

... More
(viii) 3x300 sq. mm.

-

31500

31500

... More
Providing and fixing of 33 KV OUTDOOR Heat Shrinkable Terminating Kits for following size XLPE Cables after removing of damaged cable jointing kit as per RESPO norms.

-

-

-

... More
(i) 3x50 sq. mm.

-

8400

8400

... More
(ii) 3x70 sq. mm.

-

8400

8400

... More
(iii) 3x95 sq. mm.

-

9450

9450

... More
(iv) 3x120 sq. mm.

-

9975

9975

... More
(v) 3x150 sq. mm.

-

10500

10500

... More
(vi) 3x185 sq. mm.

-

11550

11550

... More
(vii) 3x240 sq. mm.

-

15750

15750

... More
(viii) 3x300 sq. mm.

-

26250

26250

... More
Providing and fixing of 33 KV STRAIGHT THROUGH Jointing Kits of following size XLPE Cables after removing of damaged cable jointing kit as per RESPO norms.

-

-

-

... More
(i) 3x50 sq. mm.

-

9450

9450

... More
(ii) 3x70 sq. mm.

-

12600

12600

... More
(iii) 3x95 sq. mm.

-

13650

13650

... More
(iv) 3x120 sq. mm.

-

15750

15750

... More
(v) 3x150 sq. mm.

-

16800

16800

... More
(vi) 3x185 sq. mm.

-

26250

26250

... More
(vii) 3x240 sq. mm.

-

27300

27300

... More
(viii) 3x300 sq. mm.

-

31500

31500

... More
Cartage of 33 KV Pilferproof/Metering Cubicle from Central Store/JE Store to workplace and old/ damage Metering Cubicle from workspace to Central Store/JE Store with safe loadingand unloading at both end. Fixing of new Pilferproof Metering Cubicle on foundation with nut & bolts. Work also includes removing and reconnecting 33 KV incoming & Outgoing Cables, removing refixing of earthing and wiring as required to complete the work etc.

-

18690

18690

... More
Cartage of 11 KV Pilferproof/Metering Cubicle from Central Store/JE Store to workplace and old/ damage Metering Cubicle from workspace to Central Store/JE Store with safe loadingand unloading at both end. Fixing of new Pilferproof Metering Cubicle on foundation with nut & bolts. Work also includes removing and reconnecting 33 KV incoming & Outgoing Cables, removing refixing of earthing and wiring as required to complete the work etc.

-

11235

11235

... More
Cartage of 33 KV CT PT Combined Unit complete with GI pipe, meter box etc. of different ratio from Central Store/JE Store to work place with safe loading & unloading at both end. Work include fabrication of angle channel with hole for mounting of new CT PT Combined Unit on 33 KV double Pole. Work also includes labour charges of fitting of channel/angle, CT PT Combined Unit & metering box with pipe and fixing of jumpers incoming & outgoing of 33 KV CT PT Combined Unit with all related work to complete the work as per RESPO manual.

-

9450

9450

... More
Cartage of 11 KV CT PT Combined Unit complete with GI pipe, meter box etc. of different ratio from Central Store/JE Store to work place with safe loading & unloading at both end. Work include fabrication of angle channel with hole for mounting of new CT PT Combined Unit on 33 KV double Pole. Work also includes labour charges of fitting of channel/angle, CT PT Combined Unit & metering box with pipe and fixing of jumpers incoming & outgoing of 33 KV CT PT Combined Unit with all related work to complete the work as per RESPO manual.

-

9450

9450

... More
Cartage of new 33 KV VCB from Central Store/JE Store to site of work and old/damage 33 KV VCB from workplace to Central Store/JE Store with safe loading and unloading at both end. Work includes labour charges for replacement of old VCB and erection of new 33 KV VCB and laying of control cable to control panel to 33 KV CT, 33 KV VCB, Power Transformer with all related work to complete the work as per RESPO manual.

-

16800

16800

... More
Cartage of new 33 KV Control Relay Panel from Central Store/JE Store to site of work and old/damage 33 KV Control Relay Panel from workplace to Central Store/JE Store with safe loading and unloading at both end. Work includes labour charges for replacement of old Control Relay Panel and erection of new Control Relay Panel and laying of control cable for control panel to 33 KV CT, 33 KV VCB, Power Transformer with all related work to complete the work as per RESPO manual.

-

16800

16800

... More
Cartage of new 11 KV VCB from Central Store/JE Store to site of work and old/damage 11 KV VCB/OCB from workplace to Central Store/JE Store with safe loading and unloading at both end. Work includes labour charges for replacement of old VCB and erection of new 11 KV VCB with removing and reconnecting 11 KV incoming and outgoing cables, removing and refixing of earthing and wiring as required in VCB with related work to complete the work as per RESPO manual.

-

13650

13650

... More
Complete repairing/maintenance of different make 11 KV VCB/OCBs installed 33/11 KV S/S including overhauling/repairing and replacement of defective/ damaged parts, complete earthing etc. alongwith cost of labour, T & P & petty materials required for proper completion of work. The repaired VCB/OCB will be tested on laod and shall be guarented for six months. The part taken out from VCB at the time of repairing shall be returned to store. The spare parts for above work required if any will be provided by the department.

-

33600

33600

... More
Cutting/chopping of thick tree branches along with small branches which touch existing line.

-

1047

1047

... More
Replacment of damaged under ground cable (o - 20 m) and jointing to restore supply of the consumer at district head quartor in under ground (UG) system supply.

-

1029

1029

... More
Complete testing of 33 KV VCB and control pannel including wiring cheking of electrical closing and triping for local and remote position and setried the fall cheking of control pannel alarm anonciation system, O/C and E/F realy new wiring in case of break down condition. Checking of defective oil binding tempreture indecator(WTI/OTI) including cost of indicator, cheking of bucoltz cercuit and set tried morsulinbox/indication box IB with all materials.

-

12285

12285

... More
Making of cable jointing kit of different size as required labour and T & P charges for making complete cable jointing kit removing the damaged kit of different voltages where material is supply by the department.

-

-

-

... More
i) 11 KV Out door and indoor cable boxes

-

7000

7000

... More
ii) 11 KV Streight throw cable boxes

-

10000

10000

... More
iii) 33 KV Out door and indoor cable boxes

-

15000

15000

... More
iv) 33 KV Streight throw cable boxes

-

17000

17000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.