Purvanchal Vidyut Vitaran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Purvanchal Vidyut Vitaran Nigam Limited - PUVVNL Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date16 Nov 2024
Closing Soon25 Nov 2024
Tender Amount₹ 8,50,000
Costs
EMD
₹ 8,500Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PVVNV_957115_4Tender No
T011/EDCK/2024-25Tender Authority
Purvanchal Vidyut Vitaran Nigam Limited ViewPurchaser Address
-Website
http://http://puvvnl.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Erection, Earthing and Installation of New pole for H.T.O.H./L.T. O.H. line and fitting of X-Arm/L.T. Bracket, Insulators and other hardware fittings.
1
-
-
Maintenance Work of 9.00 Mtr. S.T. Pole (Decentralized Material will be provided by Contractor)
-
-
-
Loading, Carriage and Unloading of New S.T. Pole from the related power house to work site and vice versa (from 1 Km to 20 Km)
1
-
-
Grouting and muffling of S.T. pole with cement brick ballast and coarse sand as per Standard Specification
1
-
-
Erection, Earthing and Installation of New pole for H.T.O.H./L.T. O.H. line and fitting of X-Arm/L.T. Bracket, Insulators and other hardware fittings.
1
-
-
Painting of S.T. Pole after rubbing, cleaning with emery paper and coating one coat of red oxide on full length of pole and then two coat of Aluminum paint X-arm from top including cast of paint and red oxide paint used should be ISI mark Ist class enamel paint.
1
-
-
Maintenance Work of 11.00 Mtr. S.T. Pole (Decentralized Material will be provided by Contractor)
-
-
-
Loading, Carriage and Unloading of New S.T. Pole from the related power house to work site and vice versa (from 1 Km to 20 Km)
1
-
-
Grouting and muffling of S.T. pole with cement brick ballast and coarse sand as per Standard Specification
1
-
-
Erection, Earthing and Installation of New pole for H.T.O.H./L.T. O.H. line and fitting of X-Arm/L.T. Bracket, Insulators and other hardware fittings.
1
-
-
Painting of S.T. Pole after rubbing, cleaning with emery paper and coating one coat of red oxide on full length of pole and then two coat of Aluminum paint X-arm from top including cast of paint and red oxide paint used should be ISI mark Ist class enamel paint.
1
-
-
Maintenance Work of 13.00 Mtr. S.T. Pole (Decentralized Material will be provided by Contractor)
-
-
-
Loading, Carriage and Unloading of New S.T. Pole from the related power house to work site and vice versa (from 1 Km to 20 Km)
1
-
-
Grouting and muffling of S.T. pole with cement brick ballast and coarse sand as per Standard Specification
1
-
-
Erection, Earthing and Installation of New pole for H.T.O.H./L.T. O.H. line and fitting of X-Arm/L.T. Bracket, Insulators and other hardware fittings.
1
-
-
Painting of S.T. Pole after rubbing, cleaning with emery paper and coating one coat of red oxide on full length of pole and then two coat of Aluminum paint X-arm from top including cast of paint and red oxide paint used should be ISI mark Ist class enamel paint.
1
-
-
Maintenance Work of Double P.C.C. Pole (Decentralized Material will be provided by Contractor)
-
-
-
Grouting and muffling of PCC pole with cement brick ballast and coarse sand as per Standard Specification
1
-
-
Erection, Earthing and Installation of New pole for H.T.O.H./L.T. O.H. line and fitting of X-Arm/L.T. Bracket, Insulators and other hardware fittings.
1
-
-
Maintenance Work of Double S.T. Pole (Decentralized Material will be provided by Contractor)
-
-
-
Grouting and muffling of S.T. pole with cement brick ballast and coarse sand as per Standard Specification
1
-
-
Erection, Earthing and Installation of New pole for H.T.O.H./L.T. O.H. line and fitting of X-Arm/L.T. Bracket, Insulators and other hardware fittings.
1
-
-
Painting of S.T. Pole after rubbing, cleaning with emery paper and coating one coat of red oxide on full length of pole and then two coat of Aluminum paint X-arm from top including cast of paint and red oxide paint used should be ISI mark Ist class enamel paint.
1
-
-
Maintenance Work of Weasel/Dog/Rabbit Conductor (Decentralized Material will be provided by Contractor)
-
-
-
Loading, carriage and unloading of Weasel/Dog/Rabbit conductor from the related Power house to work site and vice versa (from 1 Km to 20 Km)
1
-
-
Laying, stringing, tensioning and binding of Weasel/Dog/Rabbit conductor for H.T./L.T. Over Head
1
-
-
Maintenance Work of A.B. Cable (Decentralized Material will be provided by Contractor)
-
-
-
Loading, carriage and unloading of A.B. Cable from the related Power house to work site and vice versa (from 1 Km to 20 Km)
1
-
-
Laying, stringing, tensioning and binding of A.B. Cable
1
-
-
Mounting & erection of single phase distribution box
1
-
-
Mounting & erection of three phase distribution box
1
-
-
Opening and reconnection of consumer connections for shifted/replaced pole
1
-
-
Maintenance Work of H.T./L.T. Cable Work (Decentralized Material will be provided by Contractor)
-
-
-
Loading, carriage and unloading of H.T./L.T. Cable from the related Power house to work site and vice versa (from 1 Km to 20 Km)
1
-
-
Digging, Laying and Covering of H.T./L.T. Cable As per RESSPO Standard.
1
-
-
Restoration of metallic/RCC road after proper repairing with appropriate materials
1
-
-
Material of cable box for 11/6.6 KV 3x50 to 3x300 sqmm for XLPE/PILLCA cable (Jointing kit will be provided by Store)
1
-
-
Maintenance Work of Damaged Distribution T/F work
-
-
-
Construction of Damaged Plinth of T/F (250KVA to 630KVA) suitable for mounting of distribution transformer. (As per RESSPO Specification)
1
-
-
Loading, carriage & unloading of distribution T/F (25 KVA to 100 KVA) from store to site & vice-versa. (1 Km to 20 Km)
1
-
-
Loading, carriage & unloading of distribution T/F (25 KVA to 100 KVA) from store to site & vice-versa. (21 Km to 40 Km)
1
-
-
Loading, carriage & unloading of distribution T/F (25 KVA to 100 KVA) from store to site & vice-versa. (41 Km to 60 Km)
1
-
-
Loading, carriage & unloading of distribution T/F (250 KVA to 630 KVA) from store to site & vice-versa. (1 Km to 20 Km)
1
-
-
Loading, carriage & unloading of distribution T/F (250 KVA to 630 KVA) from store to site & vice-versa. (21 Km to 40 Km)
1
-
-
Loading, carriage & unloading of distribution T/F (250 KVA to 630 KVA) from store to site & vice-versa. (41 Km to 60 Km)
1
-
-
Installation of Distribution T/F on plinth/Double pole structure.
1
-
-
To provide of Distribution T/F M S Strip (50x6 mm) fencing (6 feet height including civil work) Painting of two coats of paint on iron based surfaces with ready paint to give bus green shade including cleaning of oil & dust.
1
-
-
Chemical Earthing for the Transformer As per RESSPO Standard.
1
-
-
Cutting of tree (including all branches) which are touching electricals lines due to electrical accident and for normal clearance of H.T. as well as L.T.O.H. Lines.
1
-
-
Loading, Carriage and Unloading of Dismantle Material from the work site to the related power house (from 1 Km to 20 Km)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%