Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Errection, Maintenance And Dismantling Of Sirsaghat Pontoon Bridge in Prayagraj, Uttar Pradesh, with an estimated contract value of Rs. 19,00,000. The bid opening date for this tender is 09-09-2019 and the last date for bid submission is 16-09-2019. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Opening Date9 Sep 2019
Closing DateCancelled
Tender Amount₹ 19,00,000
Costs
EMD
₹ 1,90,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_CEALD_379291_1Tender No
262/3A/19 Dated 14-08-2019Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(V) Same as above Item No. 28 but Sal Edging
260
3640
14
... More
Dismantalling of pontoons in pairs & proper anchoring at right side (Tela Side) including all labour T&P etc required for proper completion of work as per direction of E/I
42
27300
650
... More
Laying of wooden anchor in the river on the U/s & D/s of pantoon bridge including their weaving by bagai badh and packing with sand filled bags (average 90 bags) before laying and fixing to pontoons with rope as directed by E/I including all labour, material etc complete.
120
82200
685
... More
S/o Nut bolts including all labour material T&P etc comple work as per direction of E/I (i) 30x300
1
7524
7524
... More
Errection of pile approaches including carriage of decking & ballies including piling as per direction of E/I labour only
100
31800
318
... More
Fixing of railing post in position with nut & bolts in bridge including making holes & all labour T&P as required as per direction of E/I
730
24090
33
... More
(Viii) Same as above Item No. 28 but material sisal rope, coir rope, washer u clamp, wire rope nut bolts
20
1380
69
... More
(III) Same as Item No. 4 but Railing Post
730
7665
10.5
... More
S/o of bagai bandh of good quality and good condition including cost of material taxes Cartage etc for proper completion work as per direction of E/I
2
4560
2280
... More
S/o Mallahi nails of approved quality 15-30 cm long including its cost cartage loading, unloading and stacking at site etc complete work as per direction of E/I
3
16140
5380
... More
(III) Same as above Item No. 28 but Railing Post
730
7665
10.5
... More
Additional haulage in river (per Km) as per direction of E/I
5
4125
825
... More
Earth work in cutting or in embankment for cambering of approach link Road including filling pits and in proper longitudinal and side grade and slope as per level given at site including cost of labour T & P complete work as per direction of E/I
1900
159600
84
... More
(VI) Same as Item No. 4 but Ballies khunta (Cartage only)
50
325
6.5
... More
(IV) Same as Item No. 4 but Sal Sleeper
2100
60900
29
... More
Supply and fixing washer including all labour material T&P etc complete work as per direction of E/I
0.5
2355
4710
... More
Bandling with the help of 10 cm horizontal ballies & 15 cm vertical ballies @ 50 cm c/c ballies and fixing below 1.00 to 3.00 m of water level and placing sand filled bags up to 30 cm above water level for completion of work as per direction of E/I
150
24750
165
... More
Making barrier on both side of bridge head as per direction of E/I
2
830
415
... More
Maintenance and watch & ward of anchor pantoon in pair from the period of dismentalling to till the errction of pantoon bridge and keeping the pantoon in pairs in safe position during the floods and receding floods
42
84000
2000
... More
Opening out U clamp from Chequered plate
1254
6897
5.5
... More
(vii) Same as above Item No. 28 but Chequered Plate
1254
69597
55.5
... More
(vii) Same as Item No. 4 but Chequered Plate
1254
71478
57
... More
(II) Same as above Item No. 28 but RS joist (10 M)
10
750
75
... More
Digging & cartage of local sand (within 2 Km) cartage including loading/unloading all labour material T&P etc complter work as per direction of E/I.
470
46530
99
... More
Spreading of local sand below chequered plate on approach road including all labour material T&P etc complete work as per direction of E/I.
470
3525
7.5
... More
Same as above item 24 but for approach link road as per direction of E/I (Three Row)
1.25
38750
31000
... More
Dismantalling of following materials of pantoon bridge pile and approach link road including cartage of these material from site of work to site store of bridge and also including loading, unloading stacking Properly and also including all taxes and labour T&P etc required for proper completion of work as per direction of E/I (i) RS joist(5.2M)
435
23925
55
... More
S/o Eucliptus ballis including all labour material T&P etc complter work as per direction of E/I. 100 mm dia
100
3000
30
... More
S/o Nariyal Rope including all labour material T&P etc complter work as per direction of E/I.
18
45900
2550
... More
Sinking of Pantoon to obtain the proper gradient as laid in dry bed by digging earth including all labour, T&P etc required for the proper completion of work as direction of E/I
5
5075
1015
... More
Same as above Item No 48 but 16x 300
0.5
3605
7210
... More
Carriage of pontoons pairs from the place of anchoring down stream side of the bridge to the bridge aglinment in water and fixing the same with other pontoons pair of bridge including labour T&P etc complete as per direction of E/I
42
37800
900
... More
(Viii) Same as Item No. 4 but material sisal rope, coir rope, washer U clamp, wire rope nut bolts
23
1587
69
... More
(II) Same as Item No. 4 but RS joist (10 M)
10
760
76
... More
(IV) Same as above Item No. 28 but Sal Sleeper
2100
56700
27
... More
Fixing of 10 mm railing wire in three row through hole of railing post and titentening with the help of railing wire clamp as per direction of E/I
2800
2380
0.85
... More
Clamping of Chequered plate
1254
10659
8.5
... More
Earth work in cutting or in embankment for cambering of approach link Road including filling pits and Kagar Cutting due to errosion of Ganga river in proper longitudinal and side grade and slope as per level given at site including cost of labour T & P complete work as per direction of E/I
900
101700
113
... More
Same as above item 24 but for approach link road as per direction of E/I ( Two Row)
0.75
13500
18000
... More
Relying of chequered plate to proper alignment and levelling dressing including shifting upto 30 m including all cost of labour T&P complete work as per direction of E/I
310
7130
23
... More
Same as above Item No 48 but 30x150
0.5
3762
7524
... More
(VI) Same as above Item No. 28 but Ballies khunta (Cartage only)
50
325
6.5
... More
S/o of sand filled cement bags of good quality & good condition duly filled with local sand and properly stitching with calcutta sutali for filling in anchor, bandling etc work including cost of all materials, labour cartage T & P etc and placing complete work as per direction of E/I
10000
95000
9.5
... More
Dragging the pantoon from dry on the river bank to river water pulling and rolling them in the water to bring in the proper position and making pairs of two pontoons with girder and achoring them in D/S of pontoons bridge including all labour, T&P etc reuired for the proper completion of work as direction of E/I
4
10160
2540
... More
S/o Eucliptus ballis including all labour material T&P etc complter work as per direction of E/I. 150 mm dia
140
10640
76
... More
Maintenance of pontoons bridge i/c piles on either side from errection to dismantalling of pantoon bridge day and night including titentening of nuts bolts of pontoons & railing posts, maintenance of chequered plates, supervision of nuts & bolts of pontoons and fixing of nuts bolts removing damaged nut bolts, tightening of ropes and watch and ward of piles bridge and pontoons bridge and other works as per direction of E/I ( from errction of pontoons bridge to till dismentalling of pontoons)
415
107900
260
... More
Levelling and dressing of road surface including cutting / filling including labour T& P complete work as per direction of E/I
2000
1800
0.9
... More
Extraction of 10 mm wire rope from railing post as per direction of E/I
2800
2380
0.85
... More
S/o PP rope including all labour material T&P complete work as per direction of E/I
18
315000
17500
... More
Carrying and spreading of Kasa Poola 5 cm thick over bridge road way before filling of 7.5 cm thick kapsa soil including cartage of Kapsa soil from a distance of 1.00 Km On either side of bridge & spreading ramming and dressing the surface as per direction of E/I
1950
19500
10
... More
S/o wooden anchor of size 2.4x 1.8x 3.1 with 10 & 15 cm balli including cost of ballies, nails all labours & T&P etc complete work as per direction of E/I
120
198000
1650