Public Works Department Tender

... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Errection, Maintenance And Dismantling Of Sirsaghat Pontoon Bridge in Prayagraj, Uttar Pradesh, with an estimated contract value of Rs. 19,00,000. The bid opening date for this tender is 09-09-2019 and the last date for bid submission is 16-09-2019. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Public Works Department - PWD Tender

Opening Date9 Sep 2019
Closing DateCancelled
Tender Amount₹ 19,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(V) Same as above Item No. 28 but Sal Edging

260

3640

14

... More
Dismantalling of pontoons in pairs & proper anchoring at right side (Tela Side) including all labour T&P etc required for proper completion of work as per direction of E/I

42

27300

650

... More
Laying of wooden anchor in the river on the U/s & D/s of pantoon bridge including their weaving by bagai badh and packing with sand filled bags (average 90 bags) before laying and fixing to pontoons with rope as directed by E/I including all labour, material etc complete.

120

82200

685

... More
S/o Nut bolts including all labour material T&P etc comple work as per direction of E/I (i) 30x300

1

7524

7524

... More
Errection of pile approaches including carriage of decking & ballies including piling as per direction of E/I labour only

100

31800

318

... More
Fixing of railing post in position with nut & bolts in bridge including making holes & all labour T&P as required as per direction of E/I

730

24090

33

... More
(Viii) Same as above Item No. 28 but material sisal rope, coir rope, washer u clamp, wire rope nut bolts

20

1380

69

... More
(III) Same as Item No. 4 but Railing Post

730

7665

10.5

... More
S/o of bagai bandh of good quality and good condition including cost of material taxes Cartage etc for proper completion work as per direction of E/I

2

4560

2280

... More
S/o Mallahi nails of approved quality 15-30 cm long including its cost cartage loading, unloading and stacking at site etc complete work as per direction of E/I

3

16140

5380

... More
(III) Same as above Item No. 28 but Railing Post

730

7665

10.5

... More
Additional haulage in river (per Km) as per direction of E/I

5

4125

825

... More
Earth work in cutting or in embankment for cambering of approach link Road including filling pits and in proper longitudinal and side grade and slope as per level given at site including cost of labour T & P complete work as per direction of E/I

1900

159600

84

... More
(VI) Same as Item No. 4 but Ballies khunta (Cartage only)

50

325

6.5

... More
(IV) Same as Item No. 4 but Sal Sleeper

2100

60900

29

... More
Supply and fixing washer including all labour material T&P etc complete work as per direction of E/I

0.5

2355

4710

... More
Bandling with the help of 10 cm horizontal ballies & 15 cm vertical ballies @ 50 cm c/c ballies and fixing below 1.00 to 3.00 m of water level and placing sand filled bags up to 30 cm above water level for completion of work as per direction of E/I

150

24750

165

... More
Making barrier on both side of bridge head as per direction of E/I

2

830

415

... More
Maintenance and watch & ward of anchor pantoon in pair from the period of dismentalling to till the errction of pantoon bridge and keeping the pantoon in pairs in safe position during the floods and receding floods

42

84000

2000

... More
Opening out U clamp from Chequered plate

1254

6897

5.5

... More
(vii) Same as above Item No. 28 but Chequered Plate

1254

69597

55.5

... More
(vii) Same as Item No. 4 but Chequered Plate

1254

71478

57

... More
(II) Same as above Item No. 28 but RS joist (10 M)

10

750

75

... More
Digging & cartage of local sand (within 2 Km) cartage including loading/unloading all labour material T&P etc complter work as per direction of E/I.

470

46530

99

... More
Spreading of local sand below chequered plate on approach road including all labour material T&P etc complete work as per direction of E/I.

470

3525

7.5

... More
Same as above item 24 but for approach link road as per direction of E/I (Three Row)

1.25

38750

31000

... More
Dismantalling of following materials of pantoon bridge pile and approach link road including cartage of these material from site of work to site store of bridge and also including loading, unloading stacking Properly and also including all taxes and labour T&P etc required for proper completion of work as per direction of E/I (i) RS joist(5.2M)

435

23925

55

... More
S/o Eucliptus ballis including all labour material T&P etc complter work as per direction of E/I. 100 mm dia

100

3000

30

... More
S/o Nariyal Rope including all labour material T&P etc complter work as per direction of E/I.

18

45900

2550

... More
Sinking of Pantoon to obtain the proper gradient as laid in dry bed by digging earth including all labour, T&P etc required for the proper completion of work as direction of E/I

5

5075

1015

... More
Same as above Item No 48 but 16x 300

0.5

3605

7210

... More
Carriage of pontoons pairs from the place of anchoring down stream side of the bridge to the bridge aglinment in water and fixing the same with other pontoons pair of bridge including labour T&P etc complete as per direction of E/I

42

37800

900

... More
(Viii) Same as Item No. 4 but material sisal rope, coir rope, washer U clamp, wire rope nut bolts

23

1587

69

... More
(II) Same as Item No. 4 but RS joist (10 M)

10

760

76

... More
(IV) Same as above Item No. 28 but Sal Sleeper

2100

56700

27

... More
Fixing of 10 mm railing wire in three row through hole of railing post and titentening with the help of railing wire clamp as per direction of E/I

2800

2380

0.85

... More
Clamping of Chequered plate

1254

10659

8.5

... More
Earth work in cutting or in embankment for cambering of approach link Road including filling pits and Kagar Cutting due to errosion of Ganga river in proper longitudinal and side grade and slope as per level given at site including cost of labour T & P complete work as per direction of E/I

900

101700

113

... More
Same as above item 24 but for approach link road as per direction of E/I ( Two Row)

0.75

13500

18000

... More
Relying of chequered plate to proper alignment and levelling dressing including shifting upto 30 m including all cost of labour T&P complete work as per direction of E/I

310

7130

23

... More
Same as above Item No 48 but 30x150

0.5

3762

7524

... More
(VI) Same as above Item No. 28 but Ballies khunta (Cartage only)

50

325

6.5

... More
S/o of sand filled cement bags of good quality & good condition duly filled with local sand and properly stitching with calcutta sutali for filling in anchor, bandling etc work including cost of all materials, labour cartage T & P etc and placing complete work as per direction of E/I

10000

95000

9.5

... More
Dragging the pantoon from dry on the river bank to river water pulling and rolling them in the water to bring in the proper position and making pairs of two pontoons with girder and achoring them in D/S of pontoons bridge including all labour, T&P etc reuired for the proper completion of work as direction of E/I

4

10160

2540

... More
S/o Eucliptus ballis including all labour material T&P etc complter work as per direction of E/I. 150 mm dia

140

10640

76

... More
Maintenance of pontoons bridge i/c piles on either side from errection to dismantalling of pantoon bridge day and night including titentening of nuts bolts of pontoons & railing posts, maintenance of chequered plates, supervision of nuts & bolts of pontoons and fixing of nuts bolts removing damaged nut bolts, tightening of ropes and watch and ward of piles bridge and pontoons bridge and other works as per direction of E/I ( from errction of pontoons bridge to till dismentalling of pontoons)

415

107900

260

... More
Levelling and dressing of road surface including cutting / filling including labour T& P complete work as per direction of E/I

2000

1800

0.9

... More
Extraction of 10 mm wire rope from railing post as per direction of E/I

2800

2380

0.85

... More
S/o PP rope including all labour material T&P complete work as per direction of E/I

18

315000

17500

... More
Carrying and spreading of Kasa Poola 5 cm thick over bridge road way before filling of 7.5 cm thick kapsa soil including cartage of Kapsa soil from a distance of 1.00 Km On either side of bridge & spreading ramming and dressing the surface as per direction of E/I

1950

19500

10

... More
S/o wooden anchor of size 2.4x 1.8x 3.1 with 10 & 15 cm balli including cost of ballies, nails all labours & T&P etc complete work as per direction of E/I

120

198000

1650



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.