Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date26 Mar 2025
Closing DateCancelled
Tender Amount₹ 1,27,77,000
Costs
EMD
₹ 8,39,000Document Cost
₹ 2,715Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEDPW_1022366_1Tender No
1260/8 Kam/e_Tendering/2024-25 Dated 11-03-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cement Treated Subbase Providing, laying and sperading Material on a prepared sub grade, adding cement @2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base.
395
4800
1896000
... More
Cement Treated Base Providing, laying, spreading on a prepared sub base, cement@4% by weight to the spread material manully mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base.
712.5
5600
3990000
... More
Providing and applying tack coat with Bitumen VG-10 using bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
8250
19
160875
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508.
8250
210
1732500
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510
8250
78
643500
... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
1691
95
160645
... More
Construction of 900 mm/350mm dia Single Row HP Culvert Excavation in foundation in ordinary soil (Loam clay or sand) including filling lift upto 1.5 metre (5fts.) into the trenches upto30 m. (100fts) & including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge upto a distance of 30m (100fts) form the foundation trenches (As per SOR 251)
163.53
125
20441.25
... More
Providing and laying cement concrete in proportion 1:4:8 with brick ballast including supply of all materials, labour and T&P etc. for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. (As per SOR 275)
6.53
8200
53546
... More
Class M-150 bricks work in 1:4 in cement and coarse sand mortar in foundation and plinth including supply of all materials labour and T&p etc.required for proper completion of the work
48.92
6270
306728.4
... More
Providing and laying reinforced cement concrete pipe NP-3 as per design in Single Row- Providing and laying reinforced cement concrete pipe NP-3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works in head parapets clause 1106. As per S.I. No. 1100 MORD Spec. (A) Hume Pipe 900 mm dia
37.5
5500
206250
... More
Providing and laying reinforced cement concrete pipe NP-3 as per design in Single Row- Providing and laying reinforced cement concrete pipe NP-3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works in head parapets clause 1106. As per S.I. No. 1100 MORD Spec. (B) Hume Pipe 350 mm dia
60
1400
84000
... More
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
73.77
77
5680.29
... More
Road Furniture
2.2
10000
22000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements