Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Road Construction
Eprocure
Opening Date16 Nov 2024
Closing Soon26 Nov 2024
Tender Amount₹ 10,89,00,000
Costs
EMD
₹ 21,78,000Document Cost
₹ 5,590Tender Fee
Refer Documents
Summary
W/s Of Patti Dasgarpara Pilkichha Road (odr)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUVZ_974590_1Tender No
74/Camp/SE Tender/jnp-gzp circle/24 date 10-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Stablized Sub-base(FDR Technology) Providing, laying, spreading and compacting of existing granular material adding cement using truck mounted / self propelled cement spreader shall have variable working width the microprocessor, controlled spray rate through augers and cellular wheels. The aggregate shall be in situ pulverized/stabilize using four wheeled drive recycler having working depth up to 50 cm with variable depth control system. Compacting with vibratory roller,pneumatic roller ,vibratory pad foot pad roller (20 tonne) to achieve design unconfined compressive strength. (Including all materials,labour T&P but excluding GST )
11375.5
-
-
Providing, laying, spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform single layer on sub base/ subgrade and compacting with the road roller to achieve the desire density. (Including all materials,labour T&P but excluding GST)
5277.25
-
-
Providing and applying tack coat with bitumen using bitumrn pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including all materials,labour T&P but excluding GST)
52772.5
-
-
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Including all materials,labour T&P but excluding GST )
2110.9
-
-
Construction of un-reinforced, dowel jointed, plain cement concrete pavement (M-35) over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. (Including all materials,labour T&P but excluding GST)
883.3
-
-
Construction of sub-grade and earthen shoulders with approved material obtained from right of way with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including all materials,labour T&P but excluding GST)
4351.1
-
-
Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundationand compacted by vibration including curing for 14 days foundation.(Including all materials,labour T&P but excluding GST)
121.6
-
-
Plain/Reinforced Cement Concrete(M-20) complete as per Drawing and Technical Specificatons.(Including all materials,labour T&P but excluding GST)
273.6
-
-
Supplying, fitting and placing HYSD bar reinforcement in super structure complete as per drawing and technical specifications.(Including all materials,labour T&P but excluding GST)
18.24
-
-
PART B
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17-02-2024 Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.
5
-
-
1st year- maintainance cost 0% on Bituminous, CC & drain work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
10.33
-
-
2nd year- maintainance cost 0.25% on Bituminous, CC & drain work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
10.33
-
-
3rd year- maintainance cost 0.50% on Bituminous, CC & drain work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
10.33
-
-
4th year- maintainance cost 0.75% on Bituminous, CC & drain work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
10.33
-
-
5th year- maintainance cost 1% on Bituminous, CC & drain work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
10.33
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%