If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date19 Feb 2025
Closing Soon27 Feb 2025
Tender Amount₹ 15,50,000
Costs
EMD
₹ 1,55,000Document Cost
₹ 854Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEUFZ_1008420_2Tender No
249/Nivida-25 dated 10.2.2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness compesed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be following by Seal Coat of either Type-C as per Technical Specification Clause 508 Mord.
1500
198
297000
... More
Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Mord
1500
70
105000
... More
Earth work in embankment and Patri in ordinary soil, including lift upto 1.5 mt and lead upto 30 mtr and also including ramming and dressing the surface to required level and slope as per direction of E/I.
220
110
24200
... More
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5m. (5fts.) and lead upto 30m. (100fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharges upto a distance of 30m. (100 fts.) from the foundation trenches. as per SOR
20
110
2200
... More
Providing and laying in Cement concrete 1:4:8(1cemeent:4find sand :8 graded brick ballast 40mmnominal size) and curingcomplete,including cost of formwork in foundation and floors. As per SI No-275
4
4350
17400
... More
Class-150 brick work in 1:4 Cement and coarse sand mortar infoundation and plinth including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work. As per SOR 305b
6
5390
32340
... More
Struck pointing on brick work in 1:2 cement mortar (1 cement & 2 fine sand) including supply of all material, labour and T&P etc. required for proper completion of work
15
210
3150
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 1st Year Maintenance cost (0.00% on Civil Cost Item no 1-4) (FOR PC work)
1
-
-
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 2nd Year Maintenance cost (0.75% on Civil Cost Item no 1-4) (FOR PC work)
1
9970
9970
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 3rd Year Maintenance cost (1.5% on Civil Cost Item no 1-5) (FOR PC work)
1
19940
19940
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 4th Year Maintenance cost (2.25% on Civil Cost Item no 1-5) (FOR PC work)
1
29910
29910
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 5th Year Maintenance cost (3.00% on Civil Cost Item no 1-5)
1
39890
39890
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%