Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Nov 2024
Closing Soon23 Nov 2024
Tender Amount₹ 20,90,000
Costs
EMD
₹ 2,09,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUVZ_970528_15Tender No
EE Ref No. 1832/4A Dt 14-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm -11.2 mm aggregates using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant,laying and rolling with three wheel static roller 80-100 KN capacity ,finished to required level and grades to be follwed by seal coat of Type -C as per Technical Specification Clause 508.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
650
168
109525
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
650
61
39650
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
100
61
6150
PART B
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024. Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 01 to 06)
1
-
-
1st year- maintainance cost 0% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
-
-
2nd year- maintainance cost 1.5% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
3495
3495.38
3rd year- maintainance cost 3 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
6990
6990.75
4th year- maintainance cost 4.50% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
10486
10486.13
5th year- maintainance cost 6 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
13981
13981.5
Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-3 as per Technical Specification clause 405.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
32
2500
80000
Construction of un reinforced plain cement concrete pavement, thickness as per design over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M30(Grade) coarse and fine aggregates confoming to IS:383 maximum size of coarse aggreagate not exceeding 25 mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design laid in approved fixed side formwork (steel channel laying and fixing of 125 micron thick polythene film wedges steel plates including levelling the formwork as per drawing) spreading the concrete with shovels rakes compacted using needle screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints and near aapproaches and construction joints admixtures as approved curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
100
7650
765000
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers,trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
160
19
3168
Plain Cement Concrete (PCC) M-10(1:3:6 Nominal Mix) in open foundation complete as per drawing and techanical specification Clause 802.(Including labour Material T&P etc. complete(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
28
5140
143920
Providing and laying Reinforced Cement Concrete in sub structure as per drawing and techanical specification clauses 800 (Excluding cost of Reinforcement)R.C.C. (m-25)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
73
7300
532900
Supplying fitting and placing TMT bar reinforcement in superstructure complete as per drawing and specification Clausees 1002,1010 & 1202. As per SOR SI No-504(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
39.6
6350
251460
PART B
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024. Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 8 to 13)
1
-
-
1st year- maintainance cost 0% CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
-
-
2nd year- maintainance cost 0.25 % CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
4441
4441.12
3rd year- maintainance cost 0.5 % CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
8882
8882.24
4th year- maintainance cost 0.75 % CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
13323
13323.36
5th year- maintainance cost 1 % CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
17764
17764.48
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%