Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date25 Jan 2025
Closing Soon12 Feb 2025
Tender Amount₹ 1,63,39,000
Costs
EMD
₹ 10,17,000Document Cost
₹ 2,715Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEDPW_997839_2Tender No
3470/8 Kam/e_Terndering/2024-25 Dated 19-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cement Treated Sub Base-Providing, laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of Sub-base.
59.25
5238
310351.5
... More
Cement Treated Base-Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of Sub-base/base.
675
6366
4297050
... More
Tack Coat-Providing and applying Tack coat with bitumen VG-10 using rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleand with Hydraulic broom as per Technical Specification Clause 503
8812.5
17
149812.5
... More
Open Graded Premix Carpet 20mm thick-Providing, laying and rolling of open - graded premix carpet of 20mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
8812.5
203
1788937.5
... More
Seal Coat- Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type "C" as per Technical Specification Clause 510
8812.5
77
678562.5
... More
Construction of Subgrade and Earthen Shoulders-Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1(Patri)
851.5
96
81744
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. S.I.No. 253
150.08
125
18760
... More
Providing concrete for plain/reinforced concrete (1:3:6) with cement, coarse sand and stone ballast 40mm in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
11.86
8000
94880
... More
Brick masonry work (1:3with coarse sand ) in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203
46.62
6200
289044
... More
Providing and laying reinforced cement concrete pipe NP3 900mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
45
5500
247500
... More
Providing and laying reinforced cement concrete pipe NP3 350mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
30
1400
42000
... More
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
70.7
77
5443.9
... More
Excavation in foundation in ordinary soil including all lead and lift and including filling, watering ramming of excavated earth into trenches or into space between the bridge and sides of foundation and trenches or into the plinth of surface earth as directed by Engineer-in-charges (S.I. No. 251)
250.44
125
31305
... More
Dewatering of water from foundation trenches as well as dewatering of water laying C.C and brick work below spring level including set and boring I/c all material , labour T&P etc. complete for Piers, abutment & curtain walls.
240
150
36000
... More
Concrete with 40mm gauge brick ballast fine sand and cement in proportion of 8:4:1 in foundation and under floor I/c supply of all material, labour and T&P etc. required for proper completion of work. S.I. No. 275
15.05
4400
66220
... More
Same as item No. 3 above but C.C. 1:3:6 in cement coarse sand and 40mm stone ballast in foundation (S.I. No. 280)
45.21
8000
361664
... More
First class brick work 1:3 cement and coarse sand, Mortar in foundation and plinth including S/o all required for proper completion of work (S.I. No. 307) in foundation & Abutment.
76.29
6200
473022.8
... More
Same as above in item No. 5 but in super structure (S.I. No. 307+309)
77.59
6600
512107.2
... More
Mild steel or iron work in plain work such as reinforcement concrete (when not including in over all rate) wrought to required shape as necessary bending and binding for proper completion of the work and also including S/O steel and its wastage and overlapping and hooks.
18
7800
140400
... More
R.C.C work in bed block with the cement coarse sand and 20mm gauge approved grit 1:1½ :3 excluding S/O reinforcement and its bending but including its fixing in position and biding the same with 24 BWG G1 binding wire and I/C the cost of binding wire and providing and fixing of necessary shuttering and its removal after completion labour, T&P etc. complete. S.I. No. 284
1.41
9600
13547.52
... More
Same as above item no 8 but R.C.C work in slab
19.49
9600
187084.8
... More
Cement concrete with 20mm grit coarse sand and cement 1:1½ including s/o all material, labour & T&P etc. required for proper completion of work in wearing coat .
3.65
9600
35078.4
... More
Struck cement pointing 1:2 with coloring material to match the brick work colour I/C S/o all material, labour .Struck cement pointing 1:2 with coloring material to match the brick work colour I/C S/o all material, labour & T&P etc. required for proper completion of the work (S.I. No. 613.3)
76.53
77
5892.81
... More
S/F of 75mm P.V.C. pipe for wipe holes I/c S/o all material labour T&P etc. complete.
128
140
17920
... More
Flush pointing on brick work with cement mortar consisting of one part cement & two parts of fine sand 1.25 F.M. including supply of all materials, labours and T&P etc. required for proper completion of work (S.I. No. 613.3)
77.8
77
5990.6
... More
Providing and laying of Tarfelt between bed block & slab I/c supply of all material, labour and T&P etc. complete.
6.72
500
3360
... More
Providing and fixing of 18mm thick Joint filler (soli Tax board) I/C cost of material Labour and T&P etc. Complete work
8.4
839
7047.6
... More
Providing and fixing of 110mm dia drainage spout M.S. pipe I/C pipe cost of material labour and T&P etc. complete.
2
240
480
... More
Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412
600
557
334200
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%