Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date21 Nov 2024
Closing Soon28 Nov 2024
Tender Amount₹ 25,65,000
Costs
EMD
₹ 2,57,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUAZ_975714_1Tender No
2092/12A Dt. 09-11-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying seal coat for sealing the voids in a bitumenous surface laid to the specified levels, grade and cross fall using type-C as per technical specification Clause 510.
3870
71
274770
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), Coarse and fine aggregates cnforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, cmpacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion , construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 - days,Using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
94
8600
808400
Maintenance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly
.
6.1 1st year- maintainance cost 0% on boq cost (all type of work including labours, Materials, T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1.29
-
-
2nd year- maintainance cost - 1.5% on on boq cost (all type of work including labours, Materials, T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) For PC Work
1.29
16272
20990.88
2nd year- maintainance cost - 0.25% on boq cost of CC Work
0.21
9624
2021.04
3rd year- maintainance cost - 3.00% on boq cost (all type of work including labours, Materials, T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1.29
32544
41981.76
3rd year- maintainance cost - 0.50% on boq cost of CC Work
0.21
19248
4042.08
4th year- maintainance cost - 4.50% on boq cost (all type of work including labours, Materials, T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1.29
48816
62972.64
4th year- maintainance cost - 0.75% on boq cost of CC Work
0.21
28871
6062.91
5th year- maintainance cost - 6.00% on boq cost (all type of work including labours, Materials, T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1.29
65088
83963.52
5th year- maintainance cost - 1.00% on boq cost of CC Work
0.21
38495
8083.95
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%