If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Eprocure
Opening Date21 Dec 2024
Closing Soon13 Jan 2025
Tender Amount₹ 4,93,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

3116.1

3162

9853108.2

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (WMM) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

1057.5

3380

3574350

... More
Providing and laying prime coat with bitumin emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 Kg/ Sqm. using mechanical means as per Technical specification clause 502(1).(Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

10557

40

422280

... More
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

740.25

11290

8357422.5

... More
Providing and laying tack coat with bitumen VG-10 using emulsion distributer at the rate of 0.20 Kg / Sqm. on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause no. 503 (I) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

49350

12

592200

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

1480.5

12420

18387810

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

649.7

58

37682.6

... More
Plain cement concrete 1:3:6 (M-10) nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

110.5

5350

591175

... More
Plain/Reinforced Cement Concrete (M-20) in Open Foundation complete as per Drawing and Technical Specifications. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

223.38

7360

1644076.8

... More
Supplying, fitting, and placing MS bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202, for Bars below 36 mm dia including over laps and wastage, where they are not welded. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

14.02

62892

881494.27

... More
Earth work in partri on both side of road including cost of T&P etc. complete. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

2467.5

125

308437.5

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

68.96

58

3999.68

... More
M-150 brick in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and tools & plants, etc required for proper completion of the work. as per MORTH Specification. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

38.4

6700

257280

... More
Providing and laying 600 mm dia NP-3 H.P. jointing with coller in proper position including cost of cemment, jute etc required for proper completion of work. But excluding cost of coller. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

25

3195

79875

... More
Providing and laying 900 mm dia NP-3 H.P. jointing with coller in proper position including cost of cemment, jute etc required for proper completion of work. But excluding cost of coller. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

25

6490

162250

... More
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 fineness modulous including supply of all materials, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. SI (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )

59.62

68

4054.16

... More
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.

1

-

-

... More
1st year- maintainance cost 0% on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

7.05

-

-

... More
2nd year- maintainance cost 0.25% on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

7.05

10594

74689.01

... More
3rd year- maintainance cost 0.50 % on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

7.05

21188

149378.02

... More
4th year- maintainance cost 0.75% on Bituminous &drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

7.05

31782

224067.04

... More
5th year- maintainance cost 1.00 % on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

7.05

42376

298756.05



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.