Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date5 Nov 2024
Closing Soon23 Nov 2024
Tender Amount₹ 65,48,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 all material, labour, T&P and Labour cess etc. complete but excluding GST.

9100

72

-

... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M.in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M distance including arrangement of water, settlement and all T&P charges as directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or Abadi area. (Where machine con not reach/move)all material, labour, T&P and Labour cess etc. complete but excluding GST.

1200

100

-

... More
For C.C Portion Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.all material, labour, T&P and Labour cess etc. complete but excluding GST. Under C.C. portion

52

4200

-

... More
Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501.all material, labour, T&P and Labour cess etc. complete but excluding GST.

178

8050

-

... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M.in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 3.00 km. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M distance including arrangement of water, settlement and all T&P charges including roller and its fuel charges (Roller charges accounted for @ 1700.00 per day with diesel for output of 325 cum per day) as directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or Abadi area. (Where machine con not reach/move)all material, labour, T&P and Labour cess etc. complete but excluding GST.

165

211

-

... More
Supply and fixing of 350 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper compeletion of work.all material, labour, T&P and Labour cess etc. complete but excluding GST.

7.5

2415

-

... More
Excavation in foundation in ordinry soil (Loam, Clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. Including cost of all labour, T&P and all taxes complete. S.I. No. 251(a).Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST.

240

110

-

... More
Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 1:4:8 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

45

6100

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806,807, 1202 ans 1204 III.R.C.C grade M 20 all material, labour, T&P and Labour cess etc. complete but excluding GST.

80

8050

-

... More
Supplying, fitting and placing TMT bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 all material, labour, T&P and Labour cess etc. complete but excluding GST.

49

8050

-

... More
Cost of maintenance for Bituminous work portion for 2ND Year @ 1.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per prevailing G.O.

2978800

-

-

... More
Cost of maintenance for Bituminous work portion for 3RD Year @ 3.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per prevailing G.O.

2978800

-

-

... More
Cost of maintenance forBituminous work portion for 4TH Year @ 4.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per prevailing G.O.

2978800

-

-

... More
Cost of maintenance for Bituminous work portion for 5TH Year @ 6.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per prevailing G.O.

2978800

-

-

... More
Cost of maintenance for Cement Concrete Portion for 2ND Year @ 0.25% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per prevailing G.O.

3043610.5

-

-

... More
Cost of maintenance for Cement Concrete Portion for 3RD Year @ 0.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per prevailing G.O.

3043610.5

-

-

... More
Cost of maintenance for Cement Concrete Portion for 4TH Year @ 0.75% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per prevailing G.O.

3043610.5

-

-

... More
Cost of maintenance for Cement Concrete Portion for 5 THYear @1.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per prevailing G.O.

3043610.5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.