Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date20 Nov 2024
Closing Soon30 Nov 2024
Tender Amount₹ 29,70,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Provinding, Laying and spreading materila on a prepared surface, subgrade adding cement @ 4 per cent by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to the achieve the desired unconfined compressive strength and to form a layer of base.Including All Taxes But Excluding GST

367

3585

1315695

... More
Providing and applying tack coat with Bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.Including All Taxes But Excluding GST

2625

15

39375

... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.Including All Taxes But Excluding GST

2625

156

409500

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including All Taxes But Excluding GST

2625

53

139125

... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. Including All Taxes But Excluding GST

65

135

8775

... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. Including All Taxes But Excluding GST

2.5

5500

13750

... More
Providing and laying of 40 mm gauge Stone balast /Brick Work under Hume pipe culvert foundation & road work including all materials, labour and T&P etc. required for completion of work.Including All Taxes But Excluding GST

12

1300

15600

... More
Class-150 (Non Modular) brick work in 1:3 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. Including All Taxes But Excluding GST

16

5500

88000

... More
Pointing on brick work on eadge floor with cement mortar 1:2 Ruled Pointing (1cement :2 Fine sand) Including All Taxes But Excluding GST

35

160

5600

... More
12mm Cement plaster with cement mortar in proportion of 1:3 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. Including All Taxes But Excluding GST

5

195

975

... More
Providing Laying and fixing of N.P.-3 Hume pipe in proper position as directed by E/I including cartage of pipes/collars upto 30m distance. Including cost of pipes/collars. 350mm Dia. Including All Taxes But Excluding GST.

7.5

1480

11100

... More
Providing Laying and fixing of N.P.-3 Hume pipe in proper position as directed by E/I including cartage of pipes/collars upto 30m distance. Including cost of pipes/collars. 600mm Dia. Including All Taxes But Excluding GST.

15

2350

35250

... More
PART-B MAINTENANCE WORK Maintenance Work for Second year

12

1726

20714.04

... More
Maintenance Work for Third year

12

3452

41429.04

... More
Maintenance Work for Fourth year

12

5178

62142.96

... More
Maintenance Work for Fifth year

12

6904

82857.96

... More
1- Cost of Maintenance of Road for Five Years will be paid as per E.N.C. Letter no.- 3689lh0-PRMC/ewy&23-24 Dt. 17.02.2024.) 2- The departmental road roller if spare, shall be made available to the contractor at site @ Rs. 2500 per day including POL charges, wages of driver and cleaner. If roller is kept idle due to non-availability of material or labour, recovery @ Rs. 2500 per day shall be made from contractor’s bill for idle period.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.