Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Road Construction
Eprocure
Opening Date13 Nov 2024
Closing Date20 Nov 2024
Tender Amount₹ 2,00,60,000
Costs
EMD
₹ 12,03,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Summary
Reconstruction Work Of Sawayajpur To Semariya Link Road
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUCZ_973493_9Bid Award Id
ViewTender No
5658 MT/1MT/E-TENDRING/U.C. DATE 26.10.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing, laying, spreading and compactingstone aggregates of specific sizes to waterbound macadam specification includingspreading in uniform thickness, hand packing,rolling with smoothwheel roller 80-100 kN instages to proper grade and camber,applyingand brooming, stone screening/bindingmaterials to fill-upthe interstices of coarseaggregate, watering and compacting to therequired density grading 2 as per TechnicalSpecification Clause 405. (Including Labour cess but Excluding GST)
(A)By Manual Means
435.38
-
-
... More
Providing, laying, spreading and compactingstone aggregates of specific sizes to waterbound macadam specification includingspreading in uniform thickness, hand packing,rolling with smooth wheel roller 80-100 kN instages to proper grade and camber, applyingand brooming, stonescreening to fill-up theinterstices of coarse aggregate, watering andcompacting to the required density Grading 3as per Technical Specification Clause 405.(A)By Manual Means (Including Labour cess but Excluding GST)
24.19
-
-
... More
Providing, laying, and spreading graded stone aggregate to Stablized wet mix macadam (cement 1% OPC & 3.5% SS Bitumen emulsion by weight of mix. ) and specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, Laying in uniform layers with Paver in Subbase/ Base course on well prepared surface and density Compacting with vibratory roller to achieve the desired Density..(Including Labour cess but Excluding GST)
1182.5
-
-
... More
(iii)Providing and applying tack coat withBitumen VG-10 using bitumen distributor atthe rate of 0.35 to 0.45 kg per sqm on theprepared granularsurfaces treated with primer& cleaned with Hydraulic broom as per (Including Bitumen, Labour cess but Excluding GST)
Technical Specification Clause 503.
11825
-
-
... More
Providing, laying and rolling of open-gradedpremix carpet of 20 mm thickness composed of13.2 mm to 5.6 mm aggregates either usingpenetration grade bitumen or emulsion torequired line, grade and level to serve aswearing course on a previously prepared base,including mixing in a suitable plant, laying androlling with a three wheel 80-100 kN static rollercapacity, finished to required level and gradesto be followed by sealcoat of either Type A orType B or Type C as per TechnicalSpecificationClause 508.Case - I By Manual Means(I)Bitumen (S-90)(IncludingBitumen, Labour cess but Excluding GST)
11825
-
-
... More
Providing and laying seal coat sealing the voidsin a bituminous surface laid to the specifiedlevels, grade and cross fall using Type A, TypeB and Type C as per Technical SpecificatioClause 510A.By Manual MeansCase - III : Type C(I)Bitumen (S-90) (Including BitumenLabour cess, but Excluding GST)
11825
-
-
... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.(Including Labour cess but Excluding GST)
645
-
-
... More
Providing concrete for plain/reinforced concretein open foundationscomplete as per drawingsand technical specifications Clause 802, 803,
1202 & 1203I.P.C.C grade M 10(i)Nominal mix 1:3:6 (Including Labour cess but Excluding GST)
1.55
-
-
... More
Brick masonry work in cement mortar infoundation complete excludingpointing andplastering as per drawing and technicalspecifications Clauses 600, 1202&amp; 1203 I. Brick masonry in 1:3 cement mortar (Including Labour cess but Excluding GST)
9.55
-
-
... More
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 (Including Labour cess but Excluding GST)
29.27
-
-
... More
Laying reinforced cement concrement pipe 1000 mm Diafor culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (Including Labour cess but Excluding GST)
10
-
-
... More
Maintenance of constructed road for next five yrears after the actual date of completion the amount to be paid as total maintenance cost for next five years in the form of installment as below. (Rates are Including Labour cess but Excluding GST)
1st Year Zero and 2nd year after the actual date of completion @ 0.75% of total construction cost.
2.15
-
-
... More
3rd year @ 1.50% of total construction cost
2.15
-
-
... More
4th year @ 2.25% of total construction cost
2.15
-
-
... More
5th year @ 3.00% of total construction cost
2.15
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements