Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date12 Feb 2024
Closing DateCancelled
Tender Amount₹ 1,50,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reconstruction work of Bibra Gurdwara road from Bibra Mod.

100

365000

3650

... More
Reconstruction work of Paipura to Shivnagar road.

250

912500

3650

... More
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.5% Emulsion (SS-2) in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Alua Nagla to Rustampur road.

150

1027500

6850

... More
Reconstruction work of Aharo to Swalepur road.

264

1808400

6850

... More
Reconstruction work of Bibra Gurdwara road from Bibra Mod.

580

3973000

6850

... More
Reconstruction work of Paipura to Shivnagar road.

300

2055000

6850

... More
Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer/Bituminous surface as per Technical Specification Clause 503. (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Alua Nagla to Rustampur road.

1500

21000

14

... More
Reconstruction work of Aharo to Swalepur road.

2640

36960

14

... More
Reconstruction work of Bibra Gurdwara road from Bibra Mod.

6000

84000

14

... More
Reconstruction work of Paipura to Shivnagar road.

3000

42000

14

... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 to required line, grade and level to serve as wearing course on a previously prepared base by manual means, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 ( By Mechanical Means) (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Alua Nagla to Rustampur road.

1500

234000

156

... More
Reconstruction work of Aharo to Swalepur road.

2640

411840

156

... More
Reconstruction work of Bibra Gurdwara road from Bibra Mod.

6000

936000

156

... More
Reconstruction work of Paipura to Shivnagar road.

3000

468000

156

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 ( By Mechanical Means) (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Alua Nagla to Rustampur road.

1500

79500

53

... More
Reconstruction work of Aharo to Swalepur road.

2640

139920

53

... More
Reconstruction work of Bibra Gurdwara road from Bibra Mod.

6000

318000

53

... More
Reconstruction work of Paipura to Shivnagar road.

3000

159000

53

... More
Brick edging on both sides of the road of first class (M-150) brick on edge laid with mud mortar including labour and supply of bricks finished to the required templete and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-Charge. (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Alua Nagla to Rustampur road.

0.5

32750

65500

... More
Reconstruction work of Bibra Gurdwara road from Bibra Mod.

2

131000

65500

... More
Reconstruction work of Paipura to Shivnagar road.

1

65500

65500

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Alua Nagla to Rustampur road.

600

102000

170

... More
Reconstruction work of Aharo to Swalepur road.

400

68000

170

... More
Reconstruction work of Bibra Gurdwara road from Bibra Mod.

2200

374000

170

... More
Reconstruction work of Paipura to Shivnagar road.

420

71400

170

... More
Maintainance of First Year (@0% of Total Work Amount of S.No. 1 to S.No.32)

1

-

-

... More
Maintainance of Second Year (@0.75% of Total Work Amount of S.No. 1 to S.No.32)

1

108533

108533.03

... More
Maintainance of Third Year (@1.50% of Total Work Amount of S.No. 1 to S.No.32)

1

217066

217066.05

... More
Maintainance of Fourth Year (@2.25% of Total Work Amount of S.No. 1 to S.No.32)

1

325599

325599.08

... More
Maintainance of Fifth Year (@3% of Total Work Amount of S.No. 1 to S.No.32)

1

434132

434132.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.