Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Eprocure
Opening Date15 Oct 2018
Closing Date25 Oct 2018
Tender Amount₹ 12,00,000
Costs
EMD
₹ 1,20,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_CEALD_262280_1Bid Award Id
ViewTender No
2496/19A-E_Tendring/2018 Date 04.10.2018Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supply of P.P. rope 28mm thick including cost of material, loading, unloading, carriage up to site of work all taxes and VAT all labour T&P complete. S.I. No. 38
12
192000
16000
... More
Supply of materials prescribed below including cost of material, loading, unloading, carriage up to site of work all taxes and VAT all labour T&P complete. At Kada Ghat
-
-
-
... More
Empty cement bags of good condition (plastic) filled with local sand including filling, stitching, stacking at site of work S.I. No. 02
8000
48000
6
... More
Begai badh S.I. No. 03
2
4200
2100
... More
Calcutta Sutli S.I. No. 04
1
3800
3800
... More
M.S. Washer of 30 mm & 20 mm S.I. No. 05
2
14000
7000
... More
Nut Bolt 30x300 mm size cartage & all local taxes included S.I. No. 06
8
57600
7200
... More
Nut Bolt 30x150 mm size cartage & all local taxes included S.I. No. 07
5
36000
7200
... More
Nut Bolt 16x300 mm size cartage & all local taxes included S.I. No. 08
6
43200
7200
... More
Large Bamboos of 7.5 cm dia. (Average) S.I. No. 13
300
3300
11
... More
Small Bamboos of 5 cm dia. (Average) S.I. No. 14
200
1200
6
... More
Mallahi nail of 15 cm. to 30 cm long S.I. No. 15
3
15600
5200
... More
Supply of Eucliptus Balli 150 mm dia (Average) S.I. No. 35 (i)
250
17500
70
... More
Supply of Eucliptus Balli 100 mm dia (Average) S.I. No. 35 (ii)
150
6000
40
... More
Supply of Eucliptus Balli 120 mm dia (Average) S.I. No. 35 (iii)
150
7500
50
... More
Making stay on both side of pontoon bridge with the help of 20 mm/10 mm wire rope (Labour only) S.I. No. 36
2
640
320
... More
Carriage and laying of spliced R.S. Joist 5.25 m including loading, unloading, cost of cartage from central store and placing on the as per direction of engineer in charge.S.I. No. 11
225
12375
55
... More
Carriage and laying of spliced R.S. Joist 10.00 m including loading, unloading, cost of cartage from central store and placing on the as per direction of engineer in charge.S.I. No. 12
10
700
70
... More
Laying of wooden anchors in the river on the up stream/down stream side of the pantoon bridge site including their weaving packing the sand filled bags (av 90 bags) properly before laying and fixing to pantoon with coir rope/sisall rope excluding cost. S.I. No. 6
50
32500
650
... More
Cortage and laying/fixing of the following material from store to bridge side including loading unloading and calliage complete.
-
-
-
... More
Railing post S.I. No. 8
150
4650
31
... More
Sal edging
130
1690
13
... More
Sal sleeper S.I. No. 9 (i)
900
25200
28
... More
chequred plate S.I. No. 7
400
30000
75
... More
Cartage and fixing of 10 mm dia wire rope with from railing post S.I. No. 26
900
720
0.8
... More
Earthwork in Excavation for making ramp both side of Pantoon bridge and both side of pile culvert trenches for in ordinary soil (loam clay or sand) including lift upto 1.5 m lead upto 50 m and dressing of sides and ramming of bottom and disposal of suplus excavated earth as directed by the E/I
2500
77500
31
... More
Construction of pile culvert (Laboure Rate only)
350
101500
290
... More
Supply of Steel railing wire 10 mm dia
200
16000
80
... More
Making bariar on both site of pantoon bridge with ballies
2
800
400
... More
Supply of wooden creats of equiliptus ballies 2.80x1.80x1.80 M size made of 8 Cm ballie including cost of labour, T&P and Material
10
21000
2100
... More
Dismantling of Chequered plate road and lifting of chequered plate lying in the alignment of road for loading into truck, including cost of cartage, loading, unloading, T&P and duly stacked in store at parade ground.
400
21600
54
... More
Extraction of 10 mm die wire rope wire from railing post and making roll.
900
720
0.8
... More
Dismantling and carrying railing post fixed in position including opening of 300 x 16 mm nut and bolt, including loading, unloading, cartage and duly stacked in store at parade ground.
150
3900
26
... More
Dismantling and carrying sal edging fixed over the sleeper including loading, unloading, cartage and duly stacked in store at parade ground store.
130
1690
13
... More
Dismantling and carrying sal sleeper in decking over the bridge including cleaning the kapsa soil and kansa loading, unloading, cartage and duly stacked in parade ground store.
900
22500
25
... More
Carrying the spliced R.S. Joist 5.25 m long between two pontoon after dismantling or pontoon pair including loading, unloading, cartage and duly stacked in store at parade ground
225
11700
52
... More
Dragging the pontoon from bridge side to safe place after dismantling including haulage of pontoon all labour T&P etc. complete.
20
44000
2200
... More
Supply of P.P. rope including cost of material, loading, unloading, carriage up to site of work all labour T&P complete.
2
32000
16000
... More
Note : GST will be paid 12% Extra as per…………
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements