Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 Nov 2024
Closing Soon31 Dec 2024
Tender Amount₹ 11,36,00,000
Costs
EMD
₹ 22,72,000Document Cost
₹ 5,590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUVZ_974210_2Tender No
102/Camp/SE Tender/jnp-gzp circle/24 date 22-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means (Including all material, T&P, labour cess etc. but excluding G.S.T.)
72105
-
-
... More
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
3600
-
-
... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
72105
-
-
... More
Providing and laying bituminous concrete (Grade-2) with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including all material, T&P, labour cess etc. but excluding G.S.T.)
2160
-
-
... More
Construction of sub grade and earthen shoulder with approved material obtained from Roadway Cutting with all lift, lead & transporting to site spreading to required slope and compacting to meet requirement of table 300.2(Including all material, T&P, labour cess etc. but excluding G.S.T.)
8000
-
-
... More
Providing & laying rubber moulded (Gray Colour) of Interlocking Concrete Block pavements having thickness 80mm including and dressing of surface to required level and slope, spreading and moisting 3cm thick local sand on bend, filling joints with local sand etc. for proper completion of the work as per drawing and Technical Specification Clause 1504 (Ch 18D NS) (Including all material, T&P, labour cess etc. but excluding G.S.T.)
3750
-
-
... More
Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundationand compacted by vibration including curing for 14 days foundation. For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
175
-
-
... More
RCC Grade M20 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
375
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super structure complete as per drawing and technical specifications For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
23.5
-
-
... More
PART A
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024
13.11
-
-
... More
1st year- maintainance cost 0% on Above Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
13.11
-
-
... More
2nd year- maintainance cost 0.25% on Above Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
13.11
-
-
... More
3rd year- maintainance cost 0.50 % on Above Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
13.11
-
-
... More
4th year- maintainance cost 0.75% on Above Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
13.11
-
-
... More
5th year- maintainance cost 1.00 % on Above Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
13.11
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%