Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Nov 2024
Closing Date19 Nov 2024
Tender Amount₹ 27,95,000
Costs
EMD
₹ 2,80,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEALD_970196_9Bid Award Id
ViewTender No
2165/19A/2024-25 Date 25-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.GST will be paid extra as per prevelling rules.
4500
12
56250
... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 80-100 KN capacity, finished to required level and grades to followed by seal coat.GST will be paid extra as per prevelling rules.
4500
175
787500
... More
Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall .GST will be paid extra as per prevelling rules.
4500
62
279000
... More
CC Work
-
-
-
... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
135
7830
1057050
... More
Maintenance Charges 5 Years from the Actual completion of Work for PC
-
-
-
... More
Maintenance cost of Ist year
1
-
-
... More
Maintenance cost of 2nd year @ 1.50 % cost of Work
1
21359
21359.25
... More
Maintenance cost of 3rd year @ 3.00 % cost of Work
1
42718
42718.5
... More
Maintenance cost of 4th year @ 4.50 % cost of Work
1
64077
64077.75
... More
Maintenance cost of 5th year @ 6.00 % cost of Work
1
85437
85437
... More
Maintenance Charges 5 Years from the Actual completion of Work for CC
-
-
-
... More
Maintenance cost of Ist year
1
-
-
... More
Maintenance cost of 2nd year @ 0.25 % cost of Work
1
2642
2642.63
... More
Maintenance cost of 3rd year @ 0.50 % cost of Work
1
5285
5285.25
... More
Maintenance cost of 4th year @ 0.75 % cost of Work
1
7927
7927.88
... More
Maintenance cost of 5th year @ 1.00 % cost of Work
1
10570
10570.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements