Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date11 Nov 2024
Closing Soon19 Nov 2024
Tender Amount₹ 5,30,000
Costs
EMD
₹ 53,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEJNS_970916_25Tender No
2242/A-7Dt. 04-11-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or i
37
120
4440
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km. (5 miles) from the side of work & including watering,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work.As per S.I. No.-255
6.5
1000
6500
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1 : 4 : 8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. As per S.I. No.-281
4.5
4300
19350
Rainforcement Cement concrete with 2cm gauge approved stone ballast, approved coarse sand. cement in the proportion 3:1.5:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.
12
7600
91200
Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured.
6.7
6827
45740.9
Maintenance of Concrete surface including Crack Sealing spot patching including restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culverts and cause ways,maintennance of guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 subjected to approval from Govt.Maintence of 1st year after completion of work @ Zero % of total cost of CC work (Sum of Amount of Sr. 1 to 8).
1
-
-
Maintenance cost for 2nd year @ 0.25% cost of work (Sum of Amount of Sr. 1 to 8).
1
1228
1228
Maintenance cost for 3rd year @ 0.50% cost of work (Sum of Amount of Sr. 1 to 8).
1
2456
2456
Maintenance cost for 4th year @ 0.75% cost of work (Sum of Amount of Sr. 1 to 8).
1
3685
3685
Maintenance cost for 5th year @ 1.00% cost of work (Sum of Amount of Sr. 1 to 8).
1
4913
4913
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%