If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date20 Mar 2025
Closing Date26 Mar 2025
Tender Amount₹ 1,29,47,661.15 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Construction Of Bhuchera To Balarguwan Link Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing laying & rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Seal coat-C Technical Specification Clause 508. (But Excluding GST)

12000

151

1812000

... More
Cement Concrete in foundation in 1:3:6 ratio of cemet coarse sand and 40 mm gauge stone ballast including supply of all materials labour and T&P etc. required for proper completion of work. (SI. No. 280) (But Excluding GST)

13.5

5480

73980

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grede and cross fall using Type C as per Technical Specification MORD sepecification no. Clause 510. as per Data Book item No. 5.12 (B) Case - III TypeC (But Excluding GST)

12000

52

624000

... More
Providing and applying tack coat with Bitumen (VG-10) using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with air compressor as per Technical Specification Clause 503. (But Excluding GST)

12000

17

204000

... More
Providing laying and spreading material on a prepared sub base, cement @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to from a layer of sub-base/base. (But Excluding GST)

1680

2650

4452000

... More
R.C.R. stone masonary in 1:3 cement and coarse sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. requried for proper completion of the work. (Additional. Item) Chapter-8 (But Excluding GST)

44

4410

194040

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (But Excluding GST)

15000

85

1275000

... More
Supply & Fixing & jointing of NP-3 Hume pipe 350 mm dia (S&S Type) up to site. (But Excluding GST)

22.5

2100

47250

... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (2.25% Construction Cost) (Excluding GST)(But Excluding GST)

3.2

84686

270997.54

... More
Supply & Fixing & jointing of NP-3 Hume pipe 600 mm dia (S&S Type) up to site. (But Excluding GST)

15

2668

40020

... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (3.00% Construction Cost) (Excluding GST)(But Excluding GST)

3.2

112915

361330.08

... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (1.50% Construction Cost) (Excluding GST) (But Excluding GST)

3.2

56457

180665.02

... More
Providing laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to from a layer of sub-base. (But Excluding GST)

1264

2390

3020960

... More
Raised pointing with cement and fine sand of 1.25 fineness modulus morter on stone work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (SI. No. 577) (But Excluding GST)

88

157

13816

... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0.00% Construction Cost) (Excluding GST) (But Excluding GST)

3.2

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (But Excluding GST)

3300

76

250800

... More
Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches. (SI. No. 251) (But Excluding GST)

76

150

11400



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.