Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date8 Oct 2024
Closing Date15 Oct 2024
Tender Amount₹ 32,23,755.5 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 3,35,000Document Cost
₹ 800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEJNS_963758_1Bid Award Id
ViewTender No
1434/NIVIDA/2024-25, DATE 01-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Dismentaling and carrying railling post fixed in position including opening of 300 x 16 mm nut and bolt including, loading, unloading cartage and duly stacked at store at site.
800
22000
27.5
Dismentaling and carrying sal edging fixed over the sleeper including loading, unloading, cartage and duly stacked in store at site.
300
4200
14
Dismentaling and carrying sal sleeper in dacking over the bridge including cleaning the kapsa soil and kansa loading, unloading, carriage and duly stacked in parade site.
2000
54000
27
Carrying the spliced RS joints 5.2 m long between two pantoon after dismentalling of pantoon pair including loading, unloading cartage and duly stacked in store at site.
450
24750
55
Opening out man hole covers including loading, unloading cartage & duly stacked in store at site.
180
6120
34
Cartage of different materials after dismentalling such as nut & bolt wire rope PP rope etc. from Ferry area to store at site.
50
3450
69
Local shifting of pantoon with in 500 m with the help of crain.
94
103400
1100
(B) Construction and Excution of work at Parichha Ghat to Ujjyan Ghat.
Dragging the pantoon from dry bed on the river bank to river water pulling and rolling them in the water to bring in the proper positing and making pairs of two pantoons with girder and anchoring them in D/S of pantoons bridge including all labour T&P etc. required for proper completion of work as per direction of E/I.
10
25400
2540
Carrying of pantoon pair from place of anchoring (D/S side of bridge) to the aligment of bridge in water and fixing the same with other pantoon pair and perfixing the same in bridge aligment.
46
41400
900
Sinking of pantoons to certain the palce anchoring down stream side of bridge to the allignment of bridge in water & fixing the same with other pantoon pair & refixing the same in bridge allignment.
10
10150
1015
Supply of sand filed cement bags of good quality & good condition duly filled with local sand and property stiching with calcutta sutli for filling in anchor, banding etc. work including cost of all materilas labour carriage T&P etc. and placing as per direction of E/I.
20250
192375
9.5
Supply of wooden ancher (2.40x1.80x3.10) with 12 and 16cm ukliptis balli.
184
303600
1650
Laying of wooden anchor in the river on the up stream / down stream side of the pantoon bridge side including their weaving and packed with and filled bags (ave 90 bags) properly before laying and fixing to pantoon with coir/sisal rope excluding cost.
184
126040
685
Supply of 6" dia and 10 to 12' long ukeliptes balli at Parichhaghat store including cost of material loading unloading, stacking and all other charges & taxes.
250
69250
277
Supply of 10mm to 40 mm dia nariyal rope(Bagai ban) including cost of material loading unloading, stacking and all other charges & taxes.
35
89250
2550
Supply of culcutta sutali including cost of material loading unloading, stacking and all other charges & taxes.
3
12225
4075
Supply of Mallahi keel (15 cm to 30 cm long) including cost of material loading unloading, stacking and all other charges & taxes.
4
21520
5380
Supply of poly papline rope (ISI mark) including cost of material loading unloading, stacking and all other charges & taxes.
3000
525000
175
Supply of 30mm dia and 15-35cm long nut bolt including cost of material loading unloading, stacking and all other charges & taxes.
3
22572
7524
Supply of 13 and 16mm dia and 300 mm long Nut bolt including cost of material loading unloading, stacking and all other charges & taxes.
3
21630
7210
Supply of M.S. washer of 20-30mm size including cost of material loading unloading, stacking and all other charges & taxes.
1.5
7065
4710
(a) Fixing of railling post including making hole with the help of drill machine over sleeper and sall edging before fixing the railing post with help of 30-16 mm. size bolt of 1.25 mtr. Center to center including completion of work.
400
13200
33
Same as above item no. 25 (a).
400
4200
10.5
Fixing of railing wire through hole of railing post due to vertical post and making wire stay of each rows and tighten of the stay clamps including making the hole in vertical ballies laobur only.
2800
2380
0.85
Making stay hole both side of pantoon bridge with the help of 20 mm wire rope Labour Rate Only.
4
1380
345
Clamping of chequered plate.
130
1105
8.5
Cartage & fixing of man hole cover in pantoon as per direction of E/I.
94
3196
34
Making barrier on both sides of bridge head as per direction of E/I.
4
1660
415
carraige and laying of R.S. joist (5mtr. Long) loading unloading cost of carriage from central store and placing on side as per direction of E/I.
400
22000
55
Carriage and laying of sall sleeper including loading unloading cost of carriage from central store and decking on the bridge as per direction of E/I.
1800
48600
27
same as item no 38 above item but as sall wood edging.
300
4200
14
carrying and spreading of kausepoola 5cm. Depth carrage road way before filling of 7.50cm. Thick kapsa soil including carriage of kapsa soil from distance of 1 km on the side of bridge spreading ramming and dressing the surface as per direction of E/I.
1610
16100
10
Cartage and laying of chekuered plate including loading unloding cost of carriage from place of store and laying at site as per direction E/I.
260
14820
57
Maintenance of pantoon bridge including pile on either side from start to end of Pariccha Ghat Bridge day night including tightening of nuts, bolts of pantoons & railing posts repair of kansa poola and kapsa soil, maintenance of chequered plates watering of way of pantoons bridge and supervision of nuts bolt of pantoons and fixing of nut bolts removing damadge nut bolts removal of khar patwar of ropes & tightening of ropes and watch and pantoon bridge and other work as per direction by E/I. (For 8 months on working period as per Shedule Rate @ 260 x 8 Months = 2080.00 x 450.00 = 936000.00
450
936000
2080
Providing , laying , spreading and compacting stone dust in blanket coat compacted thickness on a prepared base & compacting with power roller including all materials, machinery, labour & T&P etc. complete.
150
142500
950
Supply of labour of watch & ward day & night at bridge site (Analysed). (15th June to 15th Oct.)
122
312320
2560
Two Coat painting of Railing post including paint And labour etc
780
21450
27.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements