Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Eprocure
Opening Date13 Nov 2024
Closing Soon20 Nov 2024
Tender Amount₹ 11,30,000
Costs
EMD
₹ 1,13,000Document Cost
₹ 856Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRZ_972606_21Tender No
3364/24A date-25/10/2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using Type-C with bitumen binder @ 0.65 kg/sqm including cost of bitumen as per Technical Specification Clause 510.
1012.5
55
55687.5
Construction of un-reinforced, dowel jointed, at expansion and construction joints only plain cement concrete pavement thicknees as per deigns over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30( Guide) coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side fromwork (steel channel) laying fixing of 125 micron thick polythene firm wedge steel plate including leveling the fromwork as per drawing uploading the concrete with shovels rakes compacted using needle screed and polate vibrators and finished in sonnotous operation including provision of contraction and expention construction joints applying debonding strip primer scalant dowel bar near approaches to bridge /culvert and construction joints admixtures as approved curing compound (where specified) and water finishing to liner and grade as per drawing and technical specification clause 1501
101.25
7300
739125
Earthwork in cutting or in Patri in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50m in depth and earthwork in embankment to be in 20 cm layers including ramming & dressing the surface to required levels and slopes and also including lift up to 1.50 m and lead upto 30 m. the earth cutting to be used in making embankment or to be deposited as spoil banks within 30m distance as directed by the Engineer-in-charge & as per S.I.No.253.
100
80
8000
Maintance Cost of Ist Year for P.C. Work @ 0.00%
0.27
-
-
Maintance Cost of Ist Year for C.C. Work @ 0.00%
0.18
-
-
Maintance Cost of 2nd Year for P.C. Work @ 1.50%
0.27
16402
4428.75
Maintance Cost of 2nd Year for C.C. Work @ 0.25%
0.18
10265
1847.81
Maintance Cost of 3rd Year for P.C. Work @ 3.00%
0.27
32805
8857.5
Maintance Cost of 3rd Year for C.C. Work @ 0.50%
0.18
20531
3695.63
Maintance Cost of 4th Year for P.C. Work @ 4.50%
0.27
49208
13286.25
Maintance Cost of 4th Year for C.C. Work @ 0.75%
0.18
30796
5543.44
Maintance Cost of 5th Year for P.C. Work @ 6.00%
0.27
65611
17715
Maintance Cost of 5th Year for C.C. Work @ 1.00%
0.18
-
41062.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%