Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date20 Dec 2024
Closing Soon18 Jan 2025
Tender Amount₹ 1,30,00,000
Costs
EMD
₹ 8,50,000Document Cost
₹ 2,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEJNS_983791_2Tender No
4264/35 C-BANDA CIRCLE/2024 DT. 25-11-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
105.66
4900
517734
... More
Plain/Reinforced Cement Concrete M25 in foundation M25 in raft & app. slab as per drawing and Technical Specification.
146.57
7100
1040647
... More
Plain/Reinforced Cement Concrete M25 for wall (abutment & pier) & slab etc. complete as per Drawing and Technical Specifications.
189.67
8250
1564777.5
... More
Providing and laying Cement concrete wearing coat M-30 grade EX.cluding reinforcement complete as per drawing and Technical Specifications
17.47
7190
125609.3
... More
Supplying, fitting and placing uncoated HYSD bar reinforcement in Super structure complete as per drawing and technical specifications
32.65
84500
2758925
... More
Plain (PCC M20) Cement Concrete etc. complete as per Drawing and Technical Specifications. (for wing wall )
126.35
6550
827592.5
... More
Providing and laying Flooring complete with Rubble stone laid in cement mortar( 1:3), as per drawing and Technical specifications laid over cement concert bedding.
63.61
4898
311561.78
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
750.65
1500
1125975
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
85.2
160
13632
... More
Pressure relife pipe of 100 mm dia shall be provided in Raft area, 0.5x.0.5 m below pressure relife pipe shall be provided in the form of invert filter.
25
160
4000
... More
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
251.05
3700
928885
... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
214.25
110
23567.5
... More
Dewatering of water if necessary at the time of excavation, concreting, massonary work upto sub soil water level including hire charges of 5HP Pump (SOR)
500
220
110000
... More
Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per MORD technical specification cause 301.5 MORD sepecification 301.5(i) S.No. 3.4
475
190
90250
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
52.5
2200
115500
... More
Supply & laying of 1000 mm dia NP-3, Hume Pipe with spigot socket joint. & all complete of works
62.5
6500
406250
... More
Approach Road
Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per MORD technical specification cause 301.5 MORD sepecification 301.5(i) S.No. 3.4
3170
120
380400
... More
Construction of Granular sub base by providing coarse graded material, mixing in a place method at O.M.C. carriage of mixed material to work site, spreading in uniform layer with motor grader on prepared surface and compacting with vibtatory power roller to achive the desired density complete as per clause 401.
288.45
2165
624494.25
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
160.4
2789
447355.6
... More
Providing , laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.5% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density.
60.75
6244
379323
... More
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom.
810
12
9720
... More
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom.
810
9
7290
... More
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder as per Job Mix by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
40.5
8900
360450
... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects on DBM
24.3
10110
245673
... More
Construction of Patri with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.including cost of cutting filling grading watering and compacting in layers complete in all respects (Earth filling in Patri)
189.75
119
22580.25
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%