Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date17 Dec 2024
Closing Date2 Jan 2025
Tender Amount₹ 83,00,000
Costs
EMD
₹ 6,15,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEAGR_983973_3Tender No
5315/7m dt 10.12.24Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Open - Graded Premix Surfacing - Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using Viscocity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller, finished to required level and grades. but including all taxes but excluding GST
15262
159
2426658
... More
Case - II : Type B - Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 200 tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade. But including all taxes but excluding GST
15262
50
763100
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per drawing over a prepared sub base with 43 grade cement as per claus 1501.2.2 M 30 (grade) coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixture of not less then 0.20cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed site form work (steel channel laying and fixing of 125 micorn thick polythine film wedges steel plates including leveling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate viobrators and finished in countinous operations including provision of contraction and expansion, construction joints applying primer sealent, dowel bars and construction joint, admixtures as approved curing of concrete slab for 14 days curing compound (where specified) and water finishing to ines and grade as per drawing and technical specification clause 1501. Including All Taxes But Excluding GST
253
7600
1922800
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
54
8200
442800
... More
Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and excluding the supply of steel and its waistage Bend, hooks, binding wire and authorized over lapping shall be measured upto floor to level
24
7100
170400
... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. Including All Taxes But Excluding GST
164
135
22140
... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. Including All Taxes But Excluding GST
25
5500
137500
... More
Class-150 (Non Modular) brick work in 1:3 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. Including All Taxes But Excluding GST
48
5500
264000
... More
PART-B MAINTENANCE WORK
Maintenance Work for Second year
12
4284
51414.96
... More
Maintenance Work for Third year
12
10405
124865.04
... More
Maintenance Work for Fourth year
12
12241
146900.04
... More
Maintenance Work for Fifth year
12
23259
279110.04
... More
1- Cost of Maintenance of Road for Five Years will be paid as per E.N.C. Letter no.- 3689lh0-PRMC/ewy&23-24 Dt. 17.02.2024.)
2- The departmental road roller if spare, shall be made available to the contractor at site @ Rs. 2500 per day including POL charges, wages of driver and cleaner. If roller is kept idle due to non-availability of material or labour, recovery @ Rs. 2500 per day shall be made from contractor’s bill for idle period.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%