Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date10 Dec 2024
Closing Date3 Jan 2025
Tender Amount₹ 2,79,50,000
Costs
EMD
₹ 15,98,000Document Cost
₹ 2,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEJNS_973670_2Tender No
1790/30C-Hamirpur Circle/2024 Date 23.09.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
cement treated Base
Providing, laying, spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road rollar at OMC to achieve the desired unconfined compressive strength to form a layer of base.
2598.75
2850
7406437.5
... More
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503.
18562.5
16
306281.25
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable mixall, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat Type C as per Technical Specification Clause 508.
18562.5
143
2654437.5
... More
Seal Coat
Providing and laying seal coat by Manual Means with VG-10 Grade Bitument sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510
18562.5
53
983812.5
... More
Construction of subgrade and earthen shoulder with approved matarial obtained from borrow pit with all lift and lead, transporting site ,spreading,grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 300.1 including stablization with 2% slaked lime including its mixing with rotavetor complete (in Patri)
5495.49
308
1692610.92
... More
Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches.
524.01
120
62881.2
... More
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 6:3:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.
21
4400
92400
... More
12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 2 part of find sand of 1.25 fineness modulus.
7.48
160
1196.8
... More
Fine Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km. (5 miles) from the side of work & including watering,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. S.I.No-255
44.06
1000
44060
... More
Bedding for Pipe Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)
15
1050
15750
... More
Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work.
(Chpt-8 Add Item (b)
400
3500
1400000
... More
Raised pointing with cement and fine sand of 1.25 fineness modulus mortar on brick work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work S.I.No-577
370
140
51800
... More
Cement concrete with 20/40mm gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (As per Chap-5 S.I. No. 279a)
41.2
5500
226600
... More
Cement concrete with 40mm gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.
4.54
4200
19068
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 617. 709, 1204.3.7 Ch-12 Item no-12.9
46.4
100
4640
... More
R.C.C. work with cement approved coarse sand and 2 cm. guage approved stone ballast in the propotion of 1 : 1.5 : 3 in bed of causeway excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttring etc. and also icnluding supply etc. and also including supply of all material, labour and T&P etc. required for proper completion of the work Binding wire cost being included in the item.As per S.I. No.-288
12.75
7500
95625
... More
Mild steel or iron wirk in plain work such as reinforced. Concrete or brick work (When not included in an over all rates) Wrought to required shape as necessary including binding for proper completion of the work and including supply of all steel wastage and over laping and hooks. S.I.No-504)
10.01
5600
56056
... More
Providing and laying of hume pipe NP-3 for culverts with filing of joints in cement and sand mortar in 1:2 including labour, T&P etc required for proper completion of work as per of Engineer-in-Charge.1000 mm dia
60
5900
354000
... More
Providing and laying of hume pipe NP-3 for culverts with filing of joints in cement and sand mortar in 1:2 including labour, T&P etc required for proper completion of work as per of Engineer-in-Charge.600 mm dia
45
2600
117000
... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 22 (Excluding G.S.T.)
Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 22)
1
-
-
... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 22 (Excluding G.S.T.)
Maintainance of Second Year (@0.75% of Total Work Amount of 1 to 22)
1
194994
194994
... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 22 (Excluding G.S.T.)
Maintainance of Third Year (@1.50% of Total Work Amount of 1 to 22)
1
389988
389988
... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 22 (Excluding G.S.T.)
Maintainance of Fourth Year (@2.25% of Total Work Amount of 1 to 22)
1
584982
584982
... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 22 (Excluding G.S.T.)
Maintainance of Fifth Year (@3% of Total Work Amount of 1 to 22)
1
779977
779977
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%