Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Eprocure
Opening Date22 Jun 2020
Closing Date7 Jul 2020
Tender Amount₹ 6,99,45,812 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing coarse graded approved material from approved quarry, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

3725

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate from approved quarry to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per clause No -406 (Including cost of all labour, T&P, Material, taxes and Labour cess but Excluding GST)

2703

-

-

... More
Providing, laying and spreading of graded stone aggregate (WMM) from approved quarry after mixing of water at OMC in mechnical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.5% Bitumen Emulsion in uniform single layer on sub base/subgrade and compacting with road roller to achieve the Desire Density. (Including cost of all labour, T&P, Material, taxes and Labour cess but Excluding GST)

1542

-

-

... More
Providing and applying tack coat first with VG.- 10 using Bitumen pressure distributor at the rate of 0.25 kg per sqm in the norms bituminous surface cleaned with mechanical broom . as per MORT&H specification clause-503 (Including cost of all labour, T&P, Material, taxes and Labour cess but Excluding GST)

99946

-

-

... More
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an avarage output of 75 tonne per hour using Dalla aggregates of specified grading premixed with bituminous binder @ 4.50 percent by weight of total mix and filler, transporting the hot mix to work site , layig with hydostatic paver finisher with sensor control to the required grade , level and aligmnment , rolling with smooth wheeled , vibratory and tendom roller to achieve the desired compaction as per MORT&H Specification Clause 507 complete in all respects. (Grading-2) (Including cost of all labour, T&P, Material, taxes and Labour cess but Excluding GST)

2498

-

-

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an avarage output of 75 tonne per hour using Dalla aggregate of specified grading premixed with bituminous binder @ 5.4 percent of mix and filler , transporting the hot mix to work site , laying with hydostatic paver finisher with sensor control to the required grade , level and aligmnment , rolling with smooth wheeled , vibratory and tendom roller to achieve the desired compaction as per MORT&H Specification Clause 509 complete in all respects. (Grading -II) (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

1249

-

-

... More
Construction of earthen shoulders and Patari with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per MORT&H specification clause -305 (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

20018

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. MORT&H Specification Clause 304 (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

1704

-

-

... More
Plain cement concrete 1:3:6 nominal mix in foundation with approved crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per MORT&H Specification Clause 2100 (Including cost of all labour, T&P, Material, taxes and Labour cess but Excluding GST)

136

-

-

... More
Brick Masonry Work in Cement Mortar 1:3 in Foundation and sub structure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications 1300 & 2200 (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

558

-

-

... More
Reinforced Cement Concrete Grade M-25 in slab complete as per Drawing and Technical Specifications. as per MoRT&H Specification Clause 1500, 1700 & 2100 (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

395

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications 1600 & 2200 (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

269

-

-

... More
Plastering with cement mortar (1:3) on brick work in sub-struchure as per Technical Specifications as per MORT&H specification clause 1300 & 2200 (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

478

-

-

... More
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km. from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&P . etc. required for proper completion of the work. (Including cost of all labour, T&P, Material, taxes and Labour cess but Excluding GST)

30

-

-

... More
Plain cement Concrete in foundation in 1:4:8 with cement , coarse sand and 40 mm gauge approved Stone Ballast including supply of all material ,. labour T&P ,etc. required for proper completion of work as per direction of E/I (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

64

-

-

... More
Cement Concrete in wearing coat or in coping in 1:2:4 with cement , coarse sand and 20 mm gauge Dalla Stone Ballast including supply of all material ,. labour T&P ,etc. required for proper completion of work as per direction of E/I (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

5

-

-

... More
Providing & laying HP 600 mm dia NP-3 with coller etc. complete including cost of hume pipe and its transpotation from factory to laying Site and its fixing complete. (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

82.5

-

-

... More
Providing & laying HP 900 mm dia NP-3 with coller etc. complete including cost of hume pipe and its transpotation from factory to laying Site and its fixing complete. (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

130

-

-

... More
Supply and fixing Reinforced cement concrete M 15 grade 5th kilometre stone of standard desing as per IRC:8-1980, fixing in position including painting and printing etc (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

2

-

-

... More
Supply and fixing Reinforced cement concrete M 15 grade ordinary kilometer stone standard desing as per IRC:8-1980, fixing in position including painting and printing etc (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

9

-

-

... More
Supply and fixing Reinforced cement concrete M 15 grade Hectometre stone standard desing as per IRC:8-1980, fixing in position including painting and printing etc (Including cost of all labour, T&P , Material, taxes and Labour cess but Excluding GST)

36

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.