Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Eprocure
Opening Date6 Sep 2019
Closing Date12 Sep 2019
Tender Amount₹ 40,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Carriage of Sal Sleeper from E&M div. Allahabad to Lodhemau Ghat, Barabanki

300

435600

1452

... More
Supply of sand filled cement bags of good quality and good condition duly filled with local sand and properly stitching with Calcutta sutli for filling anchor, bundling etc, work including cost of all material labour carriage T&P etc and placing as per direction of E/I , Lodhemau Ghat, Barabanki.

7720

96500

12.5

... More
Supply of Nails of approved quality 15-30 cm long including its cost, carriage, loading, unloading, and stacking at site etc complete as per direction of E/I,Lodhemau Ghat, Barabanki.

4.5

34614

7692

... More
Supply of Moonj rope of approved quality at Lorhemau ghat temporary store including all taxes complete work. at Lodhemau Ghat, Barabanki.

60

173040

2884

... More
Supply of Nut Bolts including cost of material loading unloading cartage stacking and all taxes at site store.

-

-

-

... More
300x30

9

60570

6730

... More
150x30

6

40380

6730

... More
300x16

6

40380

6730

... More
MS Washer

3

20190

6730

... More
J Hook

18

121140

6730

... More
Supply of wooden Anchor of size 2.40x1.80x3.10m with 10 & 15 cm eucalyptus balli including cost of bellies, nails, all labour and T&P etc required for proper completion of work as per direction of E/I,Lodhemau Ghat, Barabanki.

77

106568

1384

... More
Supply of eucalyptus bellies 10 cm dia. At Lodhemau Ghat, Barabanki

600

31200

52

... More
Supply of eucalyptus bellies 15 cm dia. At Lodhemau Ghat, Barabanki

600

34200

57

... More
Supply of Large Boat (only hire charge) 4nox30 days = 120 No. at Lodhemau Ghat, Barabanki

274

126040

460

... More
Local Carriage of Various item such as rope , Neal, Nut Bolt & M.S. washer etc. including loading, unloading and proper stacking at Lodhemau Ghat, Barabanki.

60

3450

57.5

... More
Carrying of Pontoon pair from the place of anchoring (down stream side of bridge) to the alignment of bridge in water and fixing the same with other pontoon pair and refixing the same in bridge alignment. at Lodhemau Ghat, Barabanki.

77

57750

750

... More
Sinking of Pontoon to certain the place anchoring down stream side of bridge to the alignment of bridge in water and fixing the same with other pontoon pair and refixing the same in bridge alignment. the place of anchoring (down stream side of bridge) to the alignment of bridge in water and fixing the same with other pontoon pair and refixing the same in bridge alignment. at Lodhemau Ghat, Barabanki.

77

66605

865

... More
Laying of wooden anchors in the river on the up stream / down stream side of the pontoon bridge site including their weaving by bagai bodh and packing with sand filled bags (average 60 bags)before laying and fixing to pontoon with rope as per direction of Engineer Incharege all labour T&P etc required for proper completion of the work.

77

44352

576

... More
Carriage and Laying of following materials from store to pontoon bridge site including loading unloading labour T&P etc. and placing as per direction of E/I required for proper completion of work.

-

-

-

... More
R.S. Joist

785

49769

63.4

... More
Railing Posts

1256

35796

28.5

... More
Sal Sleeper

3985

95640

24

... More
Sal Edging

442

5304

12

... More
Iron anchor

77

3542

46

... More
Chequered Plates

1800

82800

46

... More
Fixing of railing Post including making hole with the help of drill machine over sleeper and sale edging before fixing the railing post with help of 30-16 mm size bolt of 1.25 meter. Center to center including completion of works.

1256

35796

28.5

... More
Fixing of railing rope through hole of railing post due to vertical post and macking wire stay of each rows and tighten of the stay clamps including making the hole vertical bellies (Labour only)Post including making hole with the help of drill machine over sleeper and sale edging before fixing the railing post with help of 30-16 mm size bolt of 1.25 meter. Center to center including completion of works.

1680

1008

0.6

... More
Supply and spreading of Sarpat pooal 5 cm thick over bridge road way before filling of 7.5 cm thick kapsa soil including cartage of kapsa soil from a distance up to 1 km either side of bridge & spreading ramming and dressing the surface as per direction of Engineer in charge for proper completion of work.

966

8307

8.6

... More
Earth work in cutting or in embankment for cambering of approach link road including filling pits and kagar cutting due to erosions of Ghaghra river in proper longitudinal and side grade and slope as per level given at site including cost of all labour and T&P Dressing and disposal of earth by head load on soil bank & River on shore as direction by the E/I etc required for proper completion of work.

1200

114000

95

... More
Disconnecting the pontoon pair including all labour, T&P. at Allahabad.

77

192500

2500

... More
Dismantling of pontoon bridge & carriage of all dismantled materials including opening of pontoon nuts bolts and sleepers, edging, iron guarders, iron angles railing posts etc all others materials from bridge site position to temp site store on the bank of river including stacking properly at site place & haulage of pontoons pairs from their bridge site potion and suitable sate place at river bank and anchoring then properly etc required for proper completion of work as per direction of E/I (Labour only)

155

357585

2307

... More
Carriage of other various item including loading unloading and proper stacking at site store.

300

17250

57.5

... More
Extracting rope railing post and making role etc. complete work.

1680

1176

0.7

... More
Dismantling of railing post fixed in bridge including opening of 300x16mm Nut bolts including loading unloading carriage up to site store complete work.

1256

28888

23

... More
Dismantling of wooden edging fixed on sleeper including loading unloading carriage up to site store complete work.

442

5083

11.5

... More
Dismantling of wooden sleeper decking river bridge including cleaning the kapsasoil and poola including loading unloading carriage up to site store complete work.

3985

91655

23

... More
Dismantling the R.S joist long between two pontoon including loading unloading carriage up to site store complete work.

785

39642

50.5

... More
Local shifting of Pontoon with in 500 m with the help of Crain.

155

143065

923

... More
Maintenance of Pantoon Bridge for 30 Oct. to 16 June.

228

114000

500

... More
ll be paid extra for above all items as per Govt. Norms.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.