If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date20 Nov 2024
Closing Soon26 Nov 2024
Tender Amount₹ 2,35,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete with 4cm gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.

1.5

4300

6450

... More
Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. S.I.No-305

15

5300

79500

... More
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 finerness modulus. S.I.No-574

12

120

1440

... More
Providing and laying of hume pipe NP-3 for culverts with filing of joints in cement and sand mortar in 1:2 including labour, T&P etc required for proper completion of work as per of Engineer-in-Charge.1000 mm dia

7.5

6000

45000

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

4

1950

7800

... More
Providing, laying, spreading and compacting stone aggregates of 45-63.mm to water bound macadam-2 specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming stone screening / blinding materials to fill up the interstices of coarse aggregates, watering and compacting to the required density grading-II as per technical specification clause 405

2.25

2200

4950

... More
Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm to water bound macadam-3 specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means

2.25

2300

5175

... More
Providing and applying Primer coat with Bitumen Emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying prime at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502.

90

44

3960

... More
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503.

90

15

1350

... More
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Technical sepecification Claues 508

90

142

12780

... More
Providing and laying seal coat by manual means with VG-10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-C As per Technical Specification Clause 510

90

50

4500

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 etc complete as per Technical Specification.

18

85

1530

... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work Maintenance cost for 1st year (@ 0 % of total work amount )

0.03

-

-

... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work Maintenance cost for 2nd year (@ 1.5 % of total work amount )

0.03

179835

5395.05

... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work Maintenance cost for 3rd year (@ 3.0 % of total work amount )

0.03

359670

10790.1

... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work Maintenance cost for 4th year (@ 4.5 % of total work amount )

0.03

539505

16185.15

... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work Maintenance cost for 5th year (@ 6.0 % of total work amount )

0.03

719340

21580.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.