Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date31 Dec 2024
Closing Date10 Jan 2025
Tender Amount₹ 5,74,00,000
Costs
EMD
₹ 11,50,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEKNP_986544_1Bid Award Id
ViewTender No
5869 M/39 M-K.F.V./2024/KNJ Date 27.11.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of embankment with approved materials obtain from Right of way with all lifts and leads, transporting to site , spreading grading to required slope and compacting to meet requirement of table 300-2
6600
-
-
... More
Construction of embankment with approved materials obtain from Right of way with all lifts and leads, transporting to site , spreading grading to required slope and compacting to meet requirement of table 300-2 (Compaction)
5660
-
-
... More
Providing, laying, spreading and compacting graded stone aggregate of granular sub base (Gr-1) by providing closed graded material mixing in a mechanical by mix in place method at site at OMC, spreading in uniform layers with Rotravator on prepared surface & compacting with vibratory power roller to achieve the desired density complete as per clause-401
1960
-
-
... More
WMM
Providing, laying and spreading of graded stoneaggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density.
660
-
-
... More
WMM+1% OPC Cement+3.5% Emulsion
Providing, laying and spreading of graded stoneaggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. MORTH Second Revision2019
3420
-
-
... More
Providing and laying 40mm thick bituminous concrete with Higher Capacity batch type HMP producing an average output of 25 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 509 complete in all respects
1240
-
-
... More
Const of sub - grade and earthe shoulders with approved materials obtain from Right of way pits with all lead and lift, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables (Patari Work)
1550
-
-
... More
Const of sub - grade and earthe shoulders with approved materials obtain from Right of way pits with all lead and lift, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables (Lead 1 km Cartage Earth)(Patari Work)
600
-
-
... More
Earth work in excavation for structurees as per chapter-05 as per Sl. No. MORD 11.1
58.26
-
-
... More
C.C. 1:3:6 in foundation with cement fine sand and stone ballast as MoRTH Specification.
5.66
-
-
... More
Providing and laying of R.C.C. Hume pipe NP-3 600mm dia
10
-
-
... More
Providing and laying of R.C.C. Hume pipe NP-3 900mm dia
12.5
-
-
... More
1st class brick work with M-150 brick and cement mortar (cement:course sand) in 1:3 as per Sch PWD 307
26.58
-
-
... More
Struck cement pointing with cement mortor 1:3 as MoRTH Specification
45.64
-
-
... More
Providing and laying Ordinary kilometer stone as per drawing of IS code
5
-
-
... More
Providing and laying Fifth kilometer stone as per drawing of IS code
1
-
-
... More
Providing and laying Hectometer stone as per drawing of IS code
22
-
-
... More
Maintenance of Bituminous Surface GO No. 17/2024/No-113/23-1-2024-23 1099/113/2023 Dt. 16.01.2024 Maintenance of 1st year after completion of work @0.00% of Cost of Construction of Work (Defect Liability Period)
1
-
-
... More
Maintenance of 2nd year after completion of work @0.25% of Cost of Construction of Work
1
-
-
... More
Maintenance of 3rd year after completion of work @ 0.50% of Cost of Construction of Work
1
-
-
... More
Maintenance of 4th year after completion of work @ 0.75 % of Cost of Construction of Work
1
-
-
... More
Maintenance of 5th year after completion of work @ 1.00 % of Cost of Construction of Work
1
-
-
Evaluation Notes How It Works ?