Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Eprocure
Opening Date26 Dec 2024
Closing Date20 Jan 2025
Tender Amount₹ 79,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,

590

6825

4026750

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical specification clause 301.5 Chap. No. 3 Sl. No. 3.4 (for Patri)

1500

88

132450

... More
Excavation in foundation in Black Cotton soil including lift up to 1.50 m and lead up to 30 m including filling watering and ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by the Engineer-in-charge as per S.I. No. 251.

400

120

48000

... More
Sand filling in foundation and plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km. from the site of work and including watering dressing etc. rate to include cost of all materials labour and T&P etc. required for proper completion of work as per S.I. No. 255.

58

1000

58000

... More
Cement concrete in foundation in 1:4:8 ratio of cement coarse sand and 40 mm gauge stone ballast including supply of all materials, labour and T&P etc. required for proper completion of work as per S.I. No. 281.

65

4200

273000

... More
R.C.R. Stone masonry with 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P required for proper completion of work as per S.I. No. 45(b).

25

3800

95000

... More
Supply and fixing of 600 mm dia NP3 type Hume Pipe with Collar in position including labour and T&P etc. required for proper completion of work.

22.5

2700

60750

... More
Supply and fixing of 1000 mm dia NP3 type Hume Pipe with Collar in position including labour and T&P etc. required for proper completion of work.

7.5

6500

48750

... More
Cement concerete in 1:2:4 on top of parapet with cement, coarse sand and 20 mm gauge granite grit including supply of all materials, labour and T&P etc. required for proper completion of work as per S.I. No. 282.

0.4

5500

2200

... More
Raised pointing with cement and fine sand of 1.25 FM mortar over RCR stone masonry work in proportion of 1:2 including supply of all materials, labour and T&P etc. required for proper completion of work as per S.I. No. 577.

40

145

5800

... More
12 mm thick plaster with cement and fine sand mortar in 1:4 including supply of all materials, labour and T&P etc. required for proper completion of work as per S.I. No. 580.

5

135

675

... More
Cement concrete with 20 gauge approved stone ballast, ap+B10roved coarse sand. cement in the proportion 3:1½:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. SI No 279(b)

120

7500

900000

... More
Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured.

70

6700

469000

... More
Maintenance of concrete surface including crack sealing spot pitching inluding restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert, maintennance of guard rails and parapet.maintenance of road sign, speed breakers, standing tree at adjacent to road wherever required. maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-1) mentioned in GO No.17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc lettere No. 3689/C- OPRMC/MUL-2023-24 dated 17.02.2024 subjected to approval from Govt.Maintence of (1st year after completion of work @ Zero % of total cost of CC work)

1

-

-

... More
Maintenance cost for 2nd year @ 0.25% cost of CC work

1

19263

19263

... More
Maintenance cost for 3rd year @ 0.50% cost of CC work

1

38527

38527

... More
Maintenance cost for 4th year @ 0.75% cost of CC work

1

57790

57790

... More
Maintenance cost for 5th year @ 1.00% cost of CC work

1

77054

77054



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.