Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date10 Nov 2024
Closing Date16 Nov 2024
Tender Amount₹ 22,93,000 
Notes
Download

Costs

Summary

Sr Of Pahasu Danpur Road Km. 13 To Himmatgarhi To Runsi Link Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.

4560

76

346560

... More
Earth work in Patri repair with ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in patries should be including ramming and dressing the surface to required levels and slopes as directed by the Engineer incharge. as per S.I. No. 253 a all taxes and labour cess complete. But excluding GST.

300

100

30000

... More
Part B CONCRETE PAVEMENT WORK Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.

12

4845

58140

... More
Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST.

36

8050

289800

... More
Earth work in Patri repair with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a Carted Earth lead upto 2.00Km as per Technical Specification Clause 301.5 all taxes and labour cess complete. But excluding GST.

32

189

6048

... More
Maintenance cost for Biuminous work portion for the 2nd year @ 1.50 % of total work amount as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024 or as per prevailing G.O.

1646520

-

24697.8

... More
Maintenance cost for Biuminous work portion for the 3rd year @ 3% of total work amount as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024 or as per prevailing G.O.

1646520

-

49395.6

... More
Maintenance cost for Biuminous work portion for the 4th year @ 4.50% of total work amount as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024 or as per prevailing G.O.

1646520

-

74093.4

... More
Maintenance cost for Biuminous work portion for the 5th year @ 6% of total work amount as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024 or as per prevailing G.O.

1646520

-

98791.2

... More
Maintenance cost for C.C. work portion for the 2th year @ 0.25% of total work amount as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024 or as per prevailing G.O.

353988

-

884.97

... More
Maintenance cost for C.C. work portion for the 3rd year @ 0.50% of total work amount as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024 or as per prevailing G.O.

353988

-

1769.94

... More
Maintenance cost for C.C. work portion for the 4the year @ 0.75% of total work amount as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024 or as per prevailing G.O.

353988

-

2654.91

... More
Maintenance cost for C.C. work portion for the 5th year @ 1.00% of total work amount as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024 or as per prevailing G.O.

353988

-

3539.88



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.