Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date24 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 69,00,000
Costs
EMD
₹ 5,45,000Document Cost
₹ 3,640Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEKNP_986502_7Tender No
6960C/131C-KV/2024 Dt. 06.12.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying and spreading material on a prepared subgrade, adding cement @ 2% by weight to the spread material manually, mixing in place with Rotavator and compacting with the Road Roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base.
284
4060
1153040
... More
Providing, laying and spreading material on a prepared base, cement @ 4%by weight to the spread material manually, mix in place with Rotavator and compacting with the Road Roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base
438
4460
1953480
... More
Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.Clause 503. MORD.
4950
16
79200
... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Case - II By Mechanical Means(HMP 30/40) (I) Bitumen VG-10
4950
175
866250
... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Case - III : Type C By Mechanical Means(HMP 30/40) (I) Bitumen VG-10
4950
57
282150
... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
1300
78
101400
... More
Providing and laying reinforced cement concrete pipe NP3 on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1100.(350 mm Dia Hume Pipe Gule)
15
1540
23100
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
6
6680
40080
... More
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 II. Brick masonry in 1:4 cement mortar
16
6770
108320
... More
Supply and laying & fixing of NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. complete.
22.5
3520
79200
... More
Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause MORD 613.3
56
83
4648
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
5.5
210
1155
... More
Lettering and painting of culverts and parapet etc. complete.
3
1000
3000
... More
Supply & fixing KM,HM & Sign board.
1.32
15000
19800
... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cutsand dressing of side slopes / berms, making up of berms / shoulders,maintenance of drains, maintenance of guard rail and parapets, maintenanceof road signs, speed breakers, standing tree adjacent to road wherever
required, maintenance of 200m (hectometre stone) and kilometre stones,cutting of branches of trees, shrubs and trimming of grass and weeds etc.,white washing of parapets including CD works, painting of guard stones and
Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/MUL-2023-24 dated 17.02.2024)
1
-
-
... More
Maintenance of First Year (@0% of Total Work Amount of 1 to 17)
1
-
-
... More
Maintenance of Second Year (@1.0 % of Total Work Amount of 1 to 17)
1
62610
62610.03
... More
Maintenance of Third Year (@1.50% of Total Work Amount of 1 to 17)
1
93915
93915.05
... More
Maintenance of Forth Year (@ 2.0 % of Total Work Amount of 1 to 17)
1
125220
125220.06
... More
Maintenance of Fifth Year (@ 3.0 % of Total Work Amount of 1 to 17)
1
187830
187830.09
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%