Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Eprocure
Opening Date24 Apr 2021
Closing Date5 May 2021
Tender Amount₹ 59,79,894 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 5,10,000Document Cost
₹ 2,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_CEJNS_584103_1Bid Award Id
ViewTender No
625(i)/35 C HAMIRPUR CIRCLE DATE 19.04.2021Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes 45-63 mm (M/B) to water bound macadam specification including spreading in uniform thickness hand packing, rolling with Three wheel roller 80-100 kN in stages to proper grade and camber applying and brooming stone screening/binding materials to fill-up the interstices of coarse aggregate. watering and compacting to the required density as per technical specification clause 405. (3)
365.63
-
2604
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes 22.4-53 mm (M/B) to water bound macadam specification including spreading in uniform thickness hand packing, rolling with Three wheel roller 80-100 kN in stages to proper grade and camber applying and brooming stone screening/binding materials to fill-up the interstices of coarse aggregate. watering and compacting to the required density as per technical specification clause 405. (3)
365.63
-
2674
... More
Providing and applying Primer coat with bitumen emulsion SS2 on Prapared surface of Granual Base Including cleaning of road surface and spraing primer at the rate of 0.7 -1.00 kg per sqm using machanical means as per Technical Specification Clause 502.
4875
-
31.5
... More
Providing and applying tack coat with vg-10 grade bitumen using pressure distributor @ 0.35 kg. per sqm on the prepared bituminous surface cleaned with machenical broom. As per MORD clause 503 (iii) as per direction of Engineer-in- charge.
4875
-
14.5
... More
20 mm thick open-Graded Premix carpet Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to Serve as wearing etc. as Per MORD Specific 508 Clause as per direction of Engineer-in- charge.
4875
-
134.5
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and croos fall using type-C, as per Technical Specification clause 510
4875
-
48
... More
Same as item No. 1 but in patries on both side of the road in -
1450.02
-
86
... More
Supply and Laying of 350 mm dia gool pipe
15
-
1255
... More
Excavation in foundation in Black Cotton Soil including lift up to 1.5 m & lead up to 30 m & including filling, watering & ramming excavated earth in to the trenches or in to the space between the building & the sides of foundation trenches or in to the plinth & removal / disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 m from the foundation trenches in Bundelkhand area requiring use of special tools & plants such as pick axes, sabbals etc. complete as per SI No. 257 / 251 & specification No. 4.1 of UP PWD.
26.14
-
121
... More
Bedding for pipe Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)
2.86
-
1010
... More
PCC work in foundation below parapates with 40 mm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including compaction by hand rammer & also including collection & cost of all materials, labour, T&P etc. required for proper completion of the work as per SI No. 280 & specification No. 5.1 of UP PWD.
3.31
-
4242
... More
Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. S.I. No.-305
12.59
-
5353
... More
Supply Laying & fixing of 600 mm dia NP-3 RCC Hume Pipe (S & S type) in position, filling required jute & cement in joints including carriage of Hume Pipe laid on road near by site of work including cost of all materials (except cost of Hume Pipe) labour, T&P etc. required for proper completion of the work as per direction of Engineer-in-charge.
7.5
-
2425
... More
Struck cement pointing with 1:2 cement and fine sand of 1.25 fineness modulus mortar with colouring materials to match the brick work colour including supply of all materials, labour and tools and plants etc. required for proper completion of the work.
16.34
-
121
... More
Cement concrete work with 20 mm gauge approved stone grit, cement & coarse sand in proportion of 1:2:4 including collection & cost of all materials, labour, T&P etc. required for porper completion of the work as per schedule item No. 279(a) & specification No. 5.1 of UP PWD & as per direction of Engineer-in-charge.
0.1
-
6363
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements