Public Works Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date19 Mar 2025
Closing Date24 Mar 2025
Tender Amount₹ 58,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Brick edging on both sides of the road of first class (M-150) brick on edge laid with mud mortar including labour and supply of bricks finished to the required templete and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-Charge. SI No 765 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.

1

69500

69500

... More
Providing & applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with Hydraulic burmer incliding as per Tecnical Specification clause 503. and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.

3750

14

52500

... More
P/L of open graded premix carpeting of 20mm thick composed with 13.2 mm to 5.60mm grit aggregate or approved graded grit @ 0.27 cum/10Sqm. using bitumen (VG-10) @ 146.00 Kg./100Sqm. as bearing course, including heating of bitumen to required temperature, and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T. Tecnical Specification clause 508

3750

172

645000

... More
Providing and applying seal coat type ‘C’ with 2.36 mm gauge stone grit @ 0.90 cum/100 Sqm & bitumen (VG-10) 65 kg/100 Sqm including heating of bitumen to required temperature, mixing of stone grit with suitable mixol, laying and rolling with a smooth wheeled roller and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.

3750

62

232500

... More
Excavation in foundation in ordinary soil (loan, clay or sand) including lift up to 1.5 m and lead up to 30m and including filling waterning and ramming of excavated earth in to the trenches or in to the space in to the building and the side of foundation tranches.3 and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.

50

110

5500

... More
Plain cement concrete with 4cm guage stone ballast and fine sand of 1.25 F.M and cement in proportion of 1:4:8 in foundation and under floors and incliding supply of all meterial T&P and labour cess etc. as per direction of Engineer in charge.required for proper completion of the work. SI No- 281 and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.

3

5750

17250

... More
Laying and compacting dry O.B.B. 40mm. Gauge in foundation in layers of not more than 15cm. Thickness including local sand, in ratio 2:1 and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.

12

1100

13200

... More
M-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.

18

5150

92700

... More
Supply and laying & fixing NP-3, 600mm dia hume pipeand including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.

15

2500

37500

... More
Supply and laying & fixing NP-3, 1000mm dia hume pipeand including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.

7.5

5500

41250

... More
Struck pointing with cement mortar consisting of 1 part cement and 2 part of the fine sand of 1.25 finenes modulus on brick work and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.

40

170

6800

... More
Concrete with 2 cm guage stone grit instead 4cm guage stone ballastof fine sand of 1.25 F.M and cement in proportion of 1:2:4 in foundation and under floors and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T. (SI No- 279 A)

0.15

6700

1005

... More
Mantinance Part A @ 7.50 %

-

-

-

... More
Maintenance of constructed Bituminous road next five year after completion the contractor shall be paid total maintenance cost 7.5% of tender Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including cess and Excluding GST) For 1st Year 0.00%

5252205

-

-

... More
Item No. 17 but for 2nd year 0.75%

5252205

-

39391.54

... More
Item No. 17 but for 3rd year 1.50%

5252205

-

78783.08

... More
Item No. 17 but for 4th year 2.25%

5252205

-

118174.61

... More
Item No. 17 but for 5th year 3.00%

5252205

-

157566.15



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.