Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Oct 2024
Closing DateCancelled
Tender Amount₹ 88,96,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing ,laying,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness ,hand packing, rolling with smooth wheel roller 80-100KN in stages to proper grade and camber ,applying and brooming, stone screening , binding material to fill up the interstices of course aggregate, watering and compacting to the required density grading 3 as per PWD specification.

275.63

1015696

3685

... More
Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base spraying primer @0.70kg / sqm using mechanical means as per Technical Specification Clause 502.

3675

141487

38.5

... More
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with mechanical broom as per Technical Specification Clause 503.

3675

58800

16

... More
Providing, laying and rolling of open - graded premix carpet of 20 mm thickness composed of 13.2 mm (sieve passing 22.4 mm & retaining 11.2mm) & 11.2 mm grit (sieve passing 13.2 mm & retaining 5.60mm) aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508.

3675

580650

158

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat.

3675

213150

58

... More
Earth work in patari in ordinary soil etc including dressing every additional 1.50m lift or part of 1.50m as per S.I. No. 253.

1158

92640

80

... More
Earth work in excavation for structures as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

388

42680

110

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanical mixed ,placed in foundation and completed by vibration inluding curing for 14 days.

57

346560

6080

... More
Plain cement concrete 1:2:4 nominal mix in foundation with crushed stone aggregate 20 mm nominal size mechanical mixed ,placed in foundation and completed by vibration inluding curing.

10.58

72790

6880

... More
Reinforcement cement concrete (M-25) in Super structure complete as per drawing and technical specification as per MORD Data Book.

11.8

68322

5790

... More
Mild Steel or iron in plain work such as in reinforced concrete including bending for proper completion of the work and including supply of steel its wastage etc.

10.8

74304

6880

... More
S/O 600 mm 7.50 R/M including supply of all material ,labour, T&P etc complete as per direction of Eng-in-charge.

15

28080

1872

... More
P/L ,Fixing, Jointing 900 mm H.P with Coller SI No. 30 (NS 5)(III)

4

1800

450

... More
Stone masonary work in cement mortar 1:4 in foundation compacted as per drawings and technical specifications .

243

1295190

5330

... More
Stone masonary work in cement mortar 1:4 in Sub structure compacted as per drawings and technical specifications .

176

987360

5610

... More
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification clause 613.3 and 1204.

278.7

54346

195

... More
Filter Media behind retaining wall as per specifications 1204.3.8 in a width of 600mm.

104

317200

3050

... More
Running of 5HP pump for dewatering including arrangement of pump suction and delivery pipes & other sccessories at site including cost of POL NS page -57

120

13200

110

... More
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%)

0.98

-

-

... More
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (1.00%)

0.98

82640

84327

... More
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (1.50%)

0.98

123960

126490

... More
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (2.00%)

0.98

165279

168653

... More
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (3.00%)

0.98

247920

252980



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.