Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Nov 2024
Closing Soon22 Nov 2024
Tender Amount₹ 9,28,000
Costs
EMD
₹ 93,000Document Cost
₹ 855Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUFZ_973292_2Tender No
3314/10A.T-1/2024-25 Date07-11-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying seal coat Type-C to sealing the voids in a bituminous surface with 6.7 mm aggregates of approved quarry using bitumen (VG-10) to required laid to the specified levels, grade and cross fall as per MORD Specification Clause 510 and as per direction of Engineer-in-charge to completion of work.
300
68
20400
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with a all lifts and leads, transporting to site. Spreading, grading to required slpoe and compacting to meet required of table 300.1 and 300.2 as per Technical specification clause 303.1
40
110
4400
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%
1
-
-
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 1.50%
1
-
1348.5
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 3.00%
1
-
2697
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 4.50%
1
-
4045.5
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 6.00%
1
-
5394
Providing, laying, spreading and compacting stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical specification clause 405
19.5
4400
85800
Construction of un-reinforced, dowel jointed, at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade), coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.20 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plats including leveling the formwork as drawing), spreading the concrete with shovels, rakes, compacted using needls, screed and plate vibrators and finshed in contunuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approadch to bridge/culvert and construction joints admixtures as approved, curing of concrete slabs for 14days curing compound(where specified) and water finishing to lines and grades as per drawing and Techincal specification clause 1501.
58.5
8700
508950
Earthwork in cutting or in embankment in ordinary soil , excavation to be in the form or regular pits not exceeding 0.50m in depth and earthwork in embankment to be in 20 cm layers, including ramming & dressing the surface to required levels and slopes and also including lift up to 1.5 m and lead up to 30 m. The earth cutting to be used in making embankment or to be deposited as spoil banks within 30m (100 ft.) distance as directed by the Engineer - in - charge.(As per SOR No. 253) 1 km cartage
45
190
8550
Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam clay or sand) including lift upto 1.5 m. lead upto 50m and dressing of sides and rammings of bottom and disposal of surplus exdavated earth as directed by the Engineer I/C within a lead of 30 m.(SOR No.251)
20
138
2760
Providing and laying Cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone ballast ballast 20mm nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in founation adn floors.(SOR No.280
11.2
6840
76608
First class bricks work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.As per SOR No. 307(a)
14.3
5600
80080
Providing and laying Cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone ballast ballast 20mm nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in founation adn floors.(SOR No.279(b))
4
7940
31760
12 mm thick plaster with cement mortar in proportion of 1:3 cement and coarse sand (SOR No. 583)
55
185
10175
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%
1
-
-
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25%
1
-
2011.71
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50%
1
-
4023.42
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75%
1
-
6035.12
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00%
1
-
8046.83
Item No. 1 to 5& 11 to 18 Cost of work (Item No. 6 to 10 & 19 to 23, 5 Year Maintenance work)
-
-
928185.08
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%