Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date31 Aug 2024
Closing Date7 Sep 2024
Tender Amount₹ 44,15,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom complete in all respect as per MORD Technical Specification Clause 503 & as per direction of Engineer-in-charge.

2625

36225

13.8

... More
Providing, laying and rolling of open - graded premix carpet of 20 mm thickness composed of 2/3 part 13.2 mm approved stone grit: (100% passed from 22.4 mm sieve and retained on 11.2 mm sieve) & 1/3 part 11.2 mm approved stone grit: (100% passed from 13.2mm sieve and retained  on  5.6 mm sieve) using bitumen VG-10 @ 1.46 kg/sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity, laying and rolling with a smooth wheeled roller, finished to required level and grades complete in all respect as per MORD Technical Specification Clause 506 & as per direction of Engineer-in-charge.

2625

448875

171

... More
Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using 6.7 mm size approved stone grit (100% passed from 9.5 mm sieve and retained on 2.36 mm sieve) and bitumin binder VG-10 @ 0.65 kg/sqm laying and rolling with a smooth wheeled roller, finished to required level and grades complete in all respect as per MORD Technical Specification Clause 508 & as per direction of Engineer-in-charge.

2625

165375

63

... More
15% Maintenance Cost on Bituminous Work (The Maintenance Cost will be calculated as per actual executed construction cost at the time of final bill)

1

-

-

... More
1st Year maintenance cost @ 0.00 percent

1

-

-

... More
2nd Year maintenance cost @ 1.50 percent

1

14497

14583

... More
3rd Year maintenance cost @ 3.00 percent

1

28994

29167

... More
4th Year maintenance cost @ 4.50 percent

1

43490

43750

... More
5th Year maintenance cost @ 6.00 percent

1

57987

58333

... More
Construction of unreinforced, plain cement concrete M30 pavement, over a prepared base, with 43 grade ordinary portland cement , coarse sand, coarse and fine aggregates conforming to IS:383, the maximum size of coarse aggregates not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mixed design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 mmicron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joint, curing of concrete slab for 14 days using curing compound (where specified) and water finishing lines and grade as per drawings complete in all respect as per MORD Technical Specification Clause 1501 & as per direction of Engineer-in-charge.

225

1703925

7573

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work complete in all respect as per MORD Technical Specification Clause 305 & as per direction of Engineer-in-charge.

334.9

28467

85

... More
Providing & laying plain cement concrete 1:3:6 in open foundations as per drawings complete in all respects as per MORD technical specification Clauses 800 /1200 & as per direction of Engineer-in-charge.

66.98

320901

4791

... More
Reinforced Cement Concrete M20 in drain as per Drawing complete in all respect as per MORD Technical Specification Clause 800 / 1200 & as per direction of Engineer-in-charge.

111.31

819130

7359

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure as per drawing and Technical Specifications complete in all respect as per MORD Technical Specification Clause 1000 & as per direction of Engineer-in-charge.

8737.44

349498

40

... More
2.50% Maintenance Cost on CC Work (The Maintenance Cost will be calculated as per actual executed construction cost at the time of final bill)

1

-

-

... More
1st Year maintenance cost @ 0.00 percent

1

-

-

... More
2nd Year maintenance cost @ 0.25 percent

1

8055

8055

... More
3rd Year maintenance cost @0.50 percent

1

16110

16109

... More
4th Year maintenance cost @0.75 percent

1

24164

24164

... More
5th Year maintenance cost @1.00 percent

1

32219

32219



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.