Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Nov 2024
Closing Date12 Dec 2024
Tender Amount₹ 45,08,000
Costs
EMD
₹ 4,25,000Document Cost
₹ 2,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEJNS_974052_3Tender No
3861/35C-Banda Circle/2024 dated 19-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Sand filling in foundation and plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km. from the site of work and including watering dressing etc. rate to include cost of all materials labour and T&P etc. required for proper completion of work as per S.I. No. 255.
62
1000
62000
Cement concrete in foundation in 1:4:8 ratio of cement coarse sand and 40 mm gauge stone ballast including supply of all materials, labour and T&P etc. required for proper completion of work as per S.I. No. 281.
62
4200
260400
R.C.R. Stone masonry with 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P required for proper completion of work as per S.I. No. 45(b).
7.27
3800
27626
Supply and fixing of 600 mm dia NP3 type Hume Pipe with Collar in position including labour and T&P etc. required for proper completion of work.
7.5
2400
18000
Raised pointing with cement and fine sand of 1.25 FM mortar over RCR stone masonry work in proportion of 1:2 including supply of all materials, labour and T&P etc. required for proper completion of work as per S.I. No. 577.
15.65
140
2191
RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:1½:3 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. SI No-289
144
7500
1080000
12 mm thick plaster with cement and fine sand mortar in 1:4 including supply of all materials, labour and T&P etc. required for proper completion of work as per S.I. No. 580.
0.81
160
129.6
Cement concrete in foundation in 1:2:4 ratio of cement coarse sand and 40 mm gauge stone ballast including supply of all materials, labour and T&P etc. required for proper completion of work as per
0.16
5500
880
HYSD Bar of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured.
113
6700
757100
Maintenance of concrete surface including crack sealing spot pitching inluding restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert,maintennance of guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-1) mentioned in GO No.17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 subjected to approval from Govt.Maintence of 1st year after completion of work @ Zero % of total cost of CC work
1
-
-
Maintenance cost for 2nd year @ 0.25% cost of CC work
1
10991
10991
Maintenance cost for 3rd year @ 0.50% cost of CC work
1
21982
21982
Maintenance cost for 4th year @ 0.75% cost of CC work
1
32973
32973
Maintenance cost for 5th year @ 1.00% cost of CC work
1
43965
43965
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%