Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date11 Nov 2024
Closing Soon18 Nov 2024
Tender Amount₹ 27,35,000
Costs
EMD
₹ 2,73,500Document Cost
₹ 854Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEALG_973040_1Tender No
3488/3A-2023-24, Date 04-11-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing,laying seal coat sealing the voids in a bitumenious surface laid to the specified levels, grade and cross fall using Type 'C' as per Technical Specification. Clause 510, of MORD specification including cost of Bitumen as per direction of E/I. (Including cost of Bitumen VG-10) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
4620
67
309540
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
300
78
23400
Part-B (CC Work)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregates, watering and compacting to the required density Grading 3 as per Technical clause 405(3), of MORD specification & as per direction of E/I. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
18.75
4150
77812.5
CEMENT CONCRETE PAVEMENT(C.C ROAD)
construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side from work (steel channel laying and fixing of 125 micron thick plastic sheet, wedges steel plates including levelling the form work as per drawing) spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continuous opration including provision of contraction and expansion construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501. Ch-20, S.I. 20 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
56.25
7700
433125
Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 m, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.1 & 300.2 with lead upto 1000 m as per Technical Specification Clause 303.5. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
50
125
6250
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. Ch-4, S.I. 251 (For Drain+H.P.) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
83
150
12450
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. Ch-5, S.I. 275(a) (For Drain+H.P.) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
13
5900
76700
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level : a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Ch-5, S.I. 6 (For Drain) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
30
8200
246000
Supplying, fitting, and placing HYSD bar reinforcement in Foundation complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 (For Drain) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
19
7700
146300
Supply, laying & fixing of N.P.-3 Hume Pipe 350mm Dia. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
7.5
1835
13762.5
Part-A (Bituminous Work) 05 Year Maintenance Charge @ 15%)
Routine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.)
1-1st Year @ Nill
1
-
-
2nd Year @ 1.50%
1
21275
21275
3rd Year @ 3.00%
1
42550
42550
4th Year @ 4.50%
1
63824
63824
5th Year @ 6.00%
1
85099
85099
Part-B (CC Work) 05 Year Maintenance Charge @ 2.50%
Routine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.)
1-1st Year @ Nill
1
-
-
2nd Year @ 0.25%
1
2531
2531
3rd Year @ 0.50%
1
5062
5062
4th Year @ 0.75%
1
7593
7593
5th Year @ 1.00%
1
10124
10124
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%