Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Road Construction
Eprocure
Opening Date10 Dec 2024
Closing Date20 Dec 2024
Tender Amount₹ 12,30,00,000
Costs
EMD
₹ 24,60,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Summary
Widening And Strengthening Of Matiyamau-mansoornagar-
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUCZ_982095_1Bid Award Id
ViewTender No
5895 M /1MT/ E-Tender/ U.C/2024 Dated 13.11.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Wet mix macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MORT&H Specifications clause 406. Including Labour Cess & excluding G.S.T.
1817.7
-
-
... More
Emulsion Treated Base with 3.5% emulsion & 1% OPC Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (with 3.5% Emulsion SS and OPC cement @ 1% by weight of Mix) specification including premixing the material with water and cement at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base coarse on well prepared surface and compacting with vibratory roller to achieve the desired density as per MORT&H Specifications and as per direction of Engineer in Charge. Including Labour Cess & excluding G.S.T.
5682.18
-
-
... More
Construction of earthen embankment using local earth obtained from excavation of trenches (compaction only) Construction of embankment with approved material obtained from excavation of treches/pits in widening portion spreading grading to reqired slope and compacted to meet the Specifications and as per direction of Engineer in Charge. Including Labour Cess & excluding G.S.T.
6597
-
-
... More
Tack Coat Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom as per MORT&H Specifications clause 503.Including Labour Cess & excluding G.S.T.
50602.5
-
-
... More
Bituminious Concrete 40 mm Thick Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with nsor contorl to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects. Including Labour Cess & excluding G.S.T.
2018.58
-
-
... More
Construction of Earthen Shoulders (For Local Earth work) Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per MORT&H Specifications clause 305.Including Labour Cess & excluding G.S.T.
3509
-
-
... More
Construction of Sub Grade and Earthen Shoulders using Carted earth Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits (Carted Earth) with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per MORT&H Specifications clause 305. Including Labour Cess & excluding G.S.T.
1041
-
-
... More
Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres as per MORT&H Specifications clause 202. Including Labour Cess & excluding G.S.T.
25.9
-
-
... More
Plain cement concrete 1:3:6 (M-10) mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days as per MORT&H Specifications clause 408. Including Labour Cess & excluding G.S.T.
178.6
-
-
... More
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations as per MORT&H Specifications clause 1300. Including Labour Cess & excluding G.S.T.
84.8
-
-
... More
Cement Pointing Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification as per MORT&H Specifications clause 1300 & 2200. Including Labour Cess & excluding G.S.T.
253
-
-
... More
Supply & Placing of Reinforcement Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications as per MORT&H Specifications clause 1600.Including Labour Cess & excluding G.S.T.
30.61
-
-
... More
RCC Grade M 20 Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification as per MORT&H Specifications clause 1500, 1600 & 1700. Including Labour Cess & excluding G.S.T.
487.35
-
-
... More
Providing and laying 1000mm Dia NP3 RCC Pipe for Culverts on Frist Class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonary works in head walls and parapets as per drawing and Technical Specifications and as per MORT&H Specifications clause 2900. Including Labour Cess & excluding G.S.T.
67.5
-
-
... More
Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc. Including Labour Cess & excluding G.S.T 5thKilometre Stone
2
-
-
... More
Kilometre Stone
9
-
-
... More
Hectometer Stone
36
-
-
... More
Maintenance of constructed road for next five yrears after completion the contractor shall be paid total maintenance cost for five year in the form of installment as below, The payment shall the inclusive of cess but excluding GST. Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor.. (Including Labour cess but Excluding GST) (i) From completion of 1 Year to 2nd year 2.50% of 10%
9.1
-
-
... More
(ii) 2nd year to 3rd year 20%
9.1
-
-
... More
(iii) 3rd year to 4th year 30%
9.1
-
-
... More
(iv) 4th year to 5th year 40%
9.1
-
-
Evaluation Notes How It Works ?